Laserfiche WebLink
�./ UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 cone from Per foe lity) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION a- AM h) FYN'n 101. <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> Co A/Atcv eanov- NazrwEP- c t-/Fv,-N/.4 <br /> BUS SS SITE ADDRESS Rm. CITY Ra. <br /> / b �, V1 crag 0/ <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> If safe to do so,facility personnel will lake immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> Y Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective in which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> D Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material.H the water is contaminated,it will be managed as hazardous waste adess a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used fm secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat in neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> HL SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected al least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete od if a licable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. Rts, R30 <br /> All. ni <br /> R31. <br /> R12. R3'r. M2 <br /> RI3. <br /> A14. Rad. Rld. <br /> RIS. R25. R33. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)LWAREE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER <br /> �THUS <br /> fRESPONSE PLAN: <br /> NAME lA r-(�--� 7 R401 TTILE Jr/ ! G <br /> NAME !1 Rdt. TITLE Rsl. <br /> NAME Rei. TITLE 02 <br /> NAME Rdl. TTFLE 03, <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional system testing m data collection ❑Inspection by qualified persons ❑Recalibration of equipment <br /> Other: <br /> R60 <br /> UST Response Plan(32086)-1/3 <br />