Laserfiche WebLink
Multiple tank installation will also require a 8.2 If tank must be ballasted during the backfill <br /> minimum of 12 inches between lank measured from procedure, at no time may the liquid exceed the <br /> each outside edge. height of the compacted backfill surrounding the <br /> tank. <br /> ANCHORING 8.3 The tank shall be encompassed by the proper / <br /> backfill and extending to a minimum of 12 inches t <br /> 7.0 Certain situations require the use of properly over the top of the tank. <br /> designed anchor straps to overcome existing 8,4 Areas subject to heavy vehicular traffic shall have <br /> buoyant forces.The straps are used in conjunction a protective cover of 18 inches clean,compacted <br /> with a concrete holddown slab or deadman soil with either 6 inches of reinforced concrete or 8 <br /> anchors. inches of asphalt paving. If compacted soil is the . <br /> CAUTION:Use of steel cable or round only cover, it shall be a minimum of 36 inches <br /> bar is prohibited. deep. <br /> 8.5 Areas not subject to heavy vehicular traffic shall <br /> INt USE Of sttn have a protectiv_cover of a minimum 18 inches of <br /> cert•Nor NDPA clean compacted soil covered by 4 inches of <br /> AS Nolo 00WN STPMS <br /> 15 eN01119��ED reinforced concrete or 6 inches of asphalt paving. If <br /> compacted soil is the only cover, it shall be a <br /> minimum of 24 inches deep. <br /> 8.6 Finishing Instructions; A fiberglassing kit is <br /> shipped with tank and provides materials to cover <br /> unused openings and external attachments,such <br /> as lifting lugs.All finishing work will be done <br /> prior to backfilling. <br /> 7.1 A pad of inert,isolation dielectric material must 9.0 For Glasteel I1 warranty to be initiated,the <br /> be used to separate the steel anchor strap from the Installation Checklist must be properly filled out <br /> tank.Isolation pads are not required when the holddown by the customer, and returned to the Modena <br /> strap material is approved fiberglass or polyester webbing. Welding Co.subsidiary from which the tank was <br /> BACKFILL fabricated- The Installation Checklist must be <br /> 8.0 Only the following approved backfill material may returned within 30 days after date of installation.If the <br /> be used. Glasteel II tank has not been installed within 90 days of <br /> 1.Clean washed Band. delivery from the manufacturer;it is required that the tank be <br /> 2.Pea Gravel-(particle site must be not less than re-certified by the manufacturer.at the owner's expense,prior <br /> 1/8 inch or more than 314 inch) to installation. <br /> 3.Washed stone or gravel erwhinge- MAINTENANCE l <br /> (angular particle size required to be not lase <br /> than 1/8 inch or more than 1/2 inch) 10.0 Maintenance of Underground Storage Tanks <br /> M7x § The primary tank should he inspected monthly for the <br /> 43skn ,; Pea �1 cnratra:' presence of water.Inspections should take place at the <br /> ` Ynw^ �t 1p - lowest possible points inside the primary tank.Remove <br /> r— ':' )/ 4 ; 1 any water found.Water and sediment in fuel can cause <br /> t. ... plugging of filters.Also,bacterial growth originating from <br /> 2 the fuel,can cause filters to plug and corrosion of tanks <br /> :� i, ,,, ... and lines.A report by the US Department of Energy, <br /> i1NvvCtr;, s BNL 48406,provides information on methods to teat for <br /> o ensure that the and remove water,test for bacterial presence in fuel, tank <br /> 8.1 Special care should be used t <br /> backfill is properly installed o evenly support the cleaning and fuel additives.Failure to remove water from <br /> the tank may void your warranty. <br /> bottom quadrant of the tank. <br /> NOTE: Do not backfill in layers using different SUBSIDIARIES NATIONWIDE: <br /> materials. <br /> Corporate Office (270)685-4400 <br /> Fwashed grade Modern Welding Company of Owensboro,Inc (270)683-5323 <br /> -- Modern Welding Company of Ohio,Inc (740)344.9426 <br /> typkasy9b4R s:.;;::;:;::•.•;:::;:'•� : :- :i Modern Welding Company of Florida,Inc (407)843-1270 <br /> Modern Welding Company of Texas,Inc (7 13)675.4211 <br /> Modena Welding Company of Texas,Inc (817)636.2215 <br /> Modern Welding Company of Iowa,Inc (319)754.6577 <br /> Modern Welding Company of California,Inc (559)275.9353 <br /> .�. 124. Modern Welding Company of Georgia, Inc (706)722.3411 ` <br /> sob" <br /> placem.nt and <br /> raqu4 o0 <br /> FORM Gla0ins, 01-2001 MWCe 2 4� Z <br />