Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDQ MONITORING <br /> 490-`4. <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54% <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING 012.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS 099.OTHERS i ____ ----._._—__.__ wase_ <br /> PANEL MANUFACTURER:Bravo °90'a1 <br /> MODEL k: <br /> LEAK SENSOR MANUFACTURER: was9 MODEL#(Sy wash <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a YES [I b.NO wos9 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a YES ®b.NO 49040' <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ®b.NO 4s 1 <br /> DOC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER Ila a.YES ❑b.NO 49042 <br /> wow <br /> L UDC CONSTRUCTION IS bal.SINGLE-WALLED ❑2.DOUBLE-WALLED <br /> 49 <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY:_UI,,LIQUID_ 02,PRF.SSLIRE_[,13:VACUUM ________--------— <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE HOC TRIGGERS AUDIBLE AND VISUAL.ALARMS Ela YES Ell, NO 490466 <br /> VII.PERIODIC SYSTEM TESTING: _ <br /> 1. ELD TESTING. THIS FACILITY HAS BEEN NOHFIFD BY THF STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49049. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC FLU IS PERFORMED EVERY 36 MON THS AS RP 1N R 2( 3 CCIt§2644 __ <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS <br /> 3.SPELL BUCKETS ARE TESTED ANNUALLY. J9Pb_t <br /> VIII RECORDKEEPING <br /> --- -- e –.. __ – ----- --.__ <br /> The following munimnng7maintena–am,—records are kept for this lauht} <br /> ®Alarm logs 49 & [j]Visual Inspection Records 4904ae [I4%7. <br /> Tank integrity testing results 490 <br /> ❑SIR testing results(and supporting documentation records). 4% d ❑ Tank gauging results(and supporting documentation records). 49 se <br /> ❑ATG Testing results(and supporting documentation records).4v elf ❑ Corrosion Protection 60-day logs 4sosss <br /> l�Equipment maintenance and calibration records. 491 <br /> ❑Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 4904% <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> M THIS UNDERGROUND STORAGE TANK MONITORING PIAN(Required)49o49e <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49049 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 44949% <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 4904% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"4so4u <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"41-wa <br /> ❑ <br /> OTHER(Specify):W*Mcsi <br /> This facility has a'Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited W,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices <br /> • The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact personas)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Protide addumnal eommems here or indicate how any pages with additional information on specific monitoring procedures Ore ntiaebed to this plan 49ngI <br /> Overfill Prevention as drop tube with mechanical flapper set at 95%. <br /> X_I.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that. I)the daily/routine US r monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following persoMs)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Mike Eliason wo-n TITLE Cardlock Mainaaer 49 n <br /> NAME James A wo-ts TITLE Site Technician 449-" <br /> The Designated Operator shall perform a monthly visual inspection of me facility, provide a report to the owner/operator,and inform the ownermpenator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE _ , 49u.n DATE: 49mn <br /> `j�/ 3/11/2009 <br /> 490-79 <br /> APPLICANT NAME(print) APPLICANT TITLE- d90.t9 <br /> Mike Eliason Cardlock Manager <br /> UPCF UST-D UV200/)374 <br />