Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE 1CONFInFUJI(ji form per facility) <br /> R01. <br /> TYPE O;ACTION ❑ 1.NEW PLAN lX 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID k (Agency Use Only) — <br /> R03. <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> Valley Pacific Petroleum-Victor Road Plant and Cardlock <br /> BUSINESS SITE ADDRESS R03. CITY Ra. <br /> 930 E Victor Road Lodi <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> D If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> D Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> D Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> IH. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly ifapplicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> Absorbent RIO. 166 Frank West Circle,Stockton 120 24/7 no <br /> Brooms,Shovels,Covered Drums Ru. 166 Frank West Circle,Stockton R21. 24/7 R31. <br /> R12. R22. R3�. <br /> R13. R23. R33. <br /> RIO, RIA. <br /> RIS. R25. 5. <br /> IV. RESPONSIBLE PERSONS 13 <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDELAN: <br /> _ <br /> NAME Mike Eliason R4°. TITLE Cardlock Manager IRONME Rs° <br /> NAME Rsl. TITLE R" <br /> Brett Panatra Operations Manager <br /> NAME Nathan Crum R42. TITLE Risk Manager <br /> NAME Dan Dan Elmer R43. TITLE President,Commercial Operations R53 <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ®Additional system testing or data collection 91 Inspection by qualified persons KI Recalibration of equipment <br /> Other: <br /> R60 <br /> UST Response Plan(3/2008)-1/3 <br />