TANK 3 LINE KEY NOTE5
<br /> QI TANK LEVEL MONITOR
<br /> Q2 3" MANIFOLD VAPOR RECOVERY. REFER TO GENERAL NOTE 022, THIS SHEET.
<br /> Q3 FILL R15ER
<br /> ® TURBINE SUMP ( TYP. OF 3) REFER TO GI°NERAL NOTE 01, THI5 SHEET.
<br /> SQ 2' FIBERGLASS PRODUCT-IN PIPING K/ 3" FIBERGLA55 SECONDARY CONTAINMENT
<br /> PIPING. REFER TO GENERAL NOTE 06 T1415 SHEET.
<br /> - © VENT RISER ( GAS OUTLET ). F�- 1
<br /> T VENT LINES ( 3 EACH ) REFER TO GENERAL NOTE 010 THIS SHEET. FJ-i C.� WrA 02 ccn
<br /> LI NE Lor=6ENI:� Q VAPOR RECOVERY RISER. REFER TO GFNERAL NOTE 0 6 THIS SHEET, (TYPICAL-2) z x rn 012
<br /> 0 6' THICK GONG, SLAB OVER UNDERGR ,HD FUEL TANKS. SEE DETAIL SHEET ~ cn co
<br /> O�
<br /> 69 OCTANE FUEL LINE TL-2, CONTRACTOR 15 TO VERIFY SLAB DIMEV61ONS WITH TANK MANUFACTURER. V
<br /> ® EXISTING DOUBLE WALL FIBERGLASS UN7ERGROIND 5TORA67E TANKS Z
<br /> -
<br /> 112 OCTANE FUEL LINE REFER TO GENERAL NOTE 02, 03, 04, THIS SHEET. O v
<br /> Q
<br /> _ _ _ _ _ _ II ANNULAR SPACE MONITOR (TYP. OF 2) F.EFER TO GENERAL NOTE
<br /> - VAPOR RECOVERY LINE 011, 020, THIS SHEET.
<br /> U
<br /> DDIESEL ENT LI1CANOPY COLUMN
<br /> LINE © e- ER. REFER TO GENEW L NOTE 016 THIS SHEET. Z 0
<br /> I
<br /> 4 6' MIN THICKNESS GONG. DRIVE SLAB w' FIBERME50. w d, s W
<br /> 55 CANOPY ABOVE
<br /> © GUARD POST, 6" SQUARE, 5EE DETAIL 16 / TL-3
<br /> NOT USED
<br /> EMr:DULL I �6 G,4NOPY q ((1) 2-A, 20 B-C FIRE EXEWY SHUT-OFF TINWISHER ITCH, SEE GEN=RAI. NOTE 016 BELOW
<br /> _ WITH 6 MPDS 0�1
<br /> - - - - - - - - - - - - g GENERAL TANK 4LINE NOT'.M
<br /> - -
<br /> - - ALL TANK AND LINE INSTALLATIONS SHALL, BE PERFORMED BY A LICENSED CONTRACTOR.
<br /> 0 o e b o o CONTRACTOR 15 REPON51BLE FOR THE COMPLETE INSTALLATION OF TANKS AND PIPPING.
<br /> I. TH5ES PLANS ARE DIGRAMMATIG IN NATUR AND ARE NOT INTENDED TO BE AN EXACT
<br /> r 3'i I r r REPRESENTATION OF FINAL PRODUCT. E.ENERAL GONTRAGTOR TO RELOCATE, MODIFY, OR
<br /> e I e e I ° I MAKE ADJ)STMENT5 TO PROVIDE A CC'•"PLETE AND WORKING SYSTEM, CONSISTENT WITH THE
<br /> O O INTENET OF THE DESIGN. CONTRACTOR 5HALL USE THESE DRAWINGS ONLY A5 AN AID.
<br /> CONTRACTOR SHALL COMPLY WITH ALL STATE, FEDERAL AND LOCAL REOUIRMENTS.
<br /> 2. EXISTING - DOUBLE WALL FIBERGLASS ' :\NKS
<br /> AS FOLLOW5, ONE (1) 12,000 GALLONS \ND ONE (2) 10000 GALLONS TANK
<br /> (3) 10,000 GALLON TANK.
<br /> g I I 3. NOT USED
<br /> 4. NOT USED
<br /> lel-" 5. GONSTRUGT A REINFORCED 8" GONGRE'^c SLAB. SET MANHOLE COYER Wt!* ABOVE SLAB
<br /> 13 i 19 I I (SLAB GROWN 1-112" MINIMUM CONCENTRIC.).
<br /> U! - I C7! 1_ I p 6. INSTALL BLACK IRON RISER FOR PHASfi It VAPOR RECOVERY AND VENT CONNECTIONS WITH
<br /> I ° ° I ° ° I ° ° I EXTRACTOR TEE AND BELL FLOAT VALDE. Z
<br /> 3 \ 1. INSTALL THREE (3) I-4Y HORSEPOWER E '-MERIBLE PUMPS WITH LEAK DETECTORS Q
<br /> j+ ) (MANHOLE COVERS TO BE WATERTIGHT).
<br /> !U t
<br /> o 0. ALL PRODUCT LINES (2,) AND 5ECONDAI�Y CONTAINMENT ( 3' PIPING SHALL BE 100% Q
<br /> o METHENOL CAMPATIBLE), U.N.O. ON PLAN. SMITH RED THREAD IIA OR AMERON ALCOHOL e
<br /> " L - J 15 SPECIFIED. ALL GLUES SHALL BE PEh,4ATEO 51-0. ALL VENTS UP TO LV
<br /> T I GRADE SHALL BE 10096 METHANOL GCI• 'ATIBLE. ALL NEW PIPING TO BE
<br /> ® \ \\\ \ I -- ---- - � '`- - - - _- - - - - -- - -' q STALL THREE PRODIC PRODUCT BELOW RY 4 GRAD3e"" DORY,DOUBL OWALL VENT LINES ( ONE FOR EACH TANK .jl Ul
<br /> 20 KU I I I INSTALLED PER MANUFACTURER'S 5PE CATIONS. Z
<br /> _- - J, _ COMPARTMENT) SLOPING K' PER FOGY . ;NIMUM BACK TO TANKS. PIPING MATERIALS TO F.'E "AME
<br /> +
<br /> r - 10. INSTALL ANNULAR SPACE MONITOR 0, 40!_.E COVERS TO BE P4ATERTICHT), { I
<br /> 12 KS / \ 1 \ TANK SLAC ` It. PROJECT TO BE SUFFICIENTLY BARRIA,,ADED DURING CONST •UGTON TO PREVENT ANY L '•�
<br /> r UNAUTHORIZED (TRESPASS) (VEHIGAL Az PEDI5TRAIN).
<br /> \ 1 \ 12. INSTALL GUARD P05T5 PER DETAIL 10 ON SHEET TL-5 V
<br /> -/--- ---- ----- - ----' - -- 13. CONSTRUCT DISPENSER ISLAND AND EXWE SLABS AS INDICATED ON DWG5. Z
<br /> OVERFILL ; 6 LL
<br /> ALARM / ALL FUEL PRODUCT, VENT AND VAPOR RETURN LINES ARE 14. INSTALL (6) NEW MPD DISPENSERS ( WIlH BOTTLE55 NOZZLES) WITH INVERTD
<br /> 8E DOUBLE WALL FIBERGLASS, SMITH RED THREAD II COAXIAL VAPOR RECOVERY, H05159, INCLUDING INVERTED COAXIAL BREAKAWAYS,
<br /> TO
<br /> 6 KD EQUIPMENT AS INDICATED ON PLANS. - Q Z
<br /> REFER To
<br /> UPPLEMENTAL
<br /> P65 FOR
<br /> DDITIONAL
<br /> ATION AND
<br /> ---- -_-\ ---- a
<br /> PIPING. -- - -- 15. MER6E TTEc PUMP
<br /> SHALL BE 3LT1TCHALL BF7 READ RAND I O' F OM PUMP
<br /> UMP5HUTDOWN D. SEESPECIFICATIONS.
<br /> O
<br /> y r _- -. - _. 16. EMERGENCY PUMP SHUT-OFF SWITCH BETWEEN IS' AND 100' FROM PUMP ISLANDS. 5EE SITE --
<br /> N.
<br /> VENTS \ 11. PLEASE NOTE, COORDINATE INSTALLATION OF PIPING, CONDUITS, AND DISPENSER BOXES TO
<br /> AVOID CONFLICTS WITH CANOPY COLUMN FOOTINGS.
<br /> - 4 16. INSTALL VEEDER-ROOT TLS-350 PLUS INVENTORY CONTROL AND INTERSTITIAL LEAK SENSING
<br /> SYSTEM PER MANUFACTURERS INSTRUCTIONS. OR PNEUMERGATOR 3000 TMS. SEE MANUFACTURERS Q
<br /> .' FOR INSTRUCTIONS. SEE ELECTRICAL AND SITE. F-IW Z
<br /> Iq. INSTALL ALL NEW PIPING PER MANUFACTURER'S SPECIFICATIONS. N 0 p z
<br /> 20. ALL PIPING, COUPLINGS, SEALANTS, ETC., SHALL BE COMPATIBLE WITH EACH OTHER AND Q- Q �
<br /> l - WITH PRODUCT TO BE STORED. V Z Q
<br /> : - 21. ALL TURBINES ARE TO BE WIRED INDIYIWALLY INTO MONITOR CONTROL 50 THAT AN Q G U
<br /> ACTIVATION OF THE SUMP MONITOR HILL SHUT DOWN THE TURBINE FOR THAT TANK. Nuj
<br /> z
<br /> 22. INSTALL 3' MANIPOLDED VAPOR RECOVERY LINES. SLOPE W PER FOOT INTO MANIFOLDED W N .Wn V ~
<br /> - - ^ 3" VAPOR RECOVERY LINE, SLOPED 4' PER FOOT INTO LOWEST GRADE REFER TO O V' w
<br /> WINa OAOMCO 110r �J /r\ SCHEMATIC DIAGRAM ON DRAWING. Qr 4 O
<br /> ONVOWIEWAL [1IJ(4 23. SIGN5 PROHIBITING SMOKING, PROH00 INS DISPENSING TO UNAPPROVED CONTAINERS AND O- 2
<br /> I1tYM1Ik� ilAON REQUIRING VEHICLE ENGINES TO BE STOPPED DURING FUELING SHALL BE CONSPICUOUSLY O- O N H
<br /> POSTED WITHI DISPENSER.
<br /> 24. RE POST INSTALLATIO . TNE55 TESTING D BY A - IGEN1!71SED TAN
<br /> L�/A -; R MUST BE RECEIVED WITHIN DAYS OF INSTALLATION.
<br /> a + . ALL Noe-
<br /> LEAK DETECTION DEVICES MU5T BE CERTIFIED OPERATION BY A QVALIFIED THIRD PARTY
<br /> ON AN ANNUAL BASIS.
<br /> i ,.. W...
<br /> F _ r0A1Ft0'0' 26. ALL PIPING INCLUDING THE VAPOR RECOVERY, VENT LINES AND PILL PIPES MUST BE DOUBLE-WALLED. _4p 'y�CmX
<br /> _ _-. MgeWFeF0704Ur
<br /> - 21. A PRECISION TANK TEST MUST BE PER.`ORMED BEFORE AN OPERATING PERMIT CAN BE ISSUED.
<br /> 26, A FULL SYSTEM FUNCTIONAL TEST WILL. BE COMPLETED PRIOR TO 51GNOFF ON THIS PROJECT. �I N0. 04
<br /> ApPW 211. A 24 (TWENTY-FOUR) HOUR LEAK TEST. 15 REQUIRFO FOR ALL SUMPS, OVERALL BUCKETS AND UDC. EXP.3-31-08
<br /> hereon anddoNeOlwtlFMMnrIEMNf1g1 « s,
<br /> I deviation from requhmeFlt•OfpaNil�INe OfICEM pdn�ncea• ALL TESTING SHALL BE WITNESSED BY Pr zFPR�ser+Tn�ve oc 5A- ypaA°w coin*Y EnIVI¢O IAtFa IIA! ,fcicA`+4�t
<br /> 30. OVERFILL ALARM SYSTEM FOR ALL UNDERGROUND TANKS SHALL BE SET AT q0% SHUT-OFF. OF
<br /> O R N T O N FZ O ?, D - - - _ - - K DA«
<br /> s 9 ua«eD
<br /> M5
<br /> DAM
<br /> 5-30-05
<br /> lcA
<br /> AS NOTED IM
<br /> Q� 02044 �y
<br /> desr v,/
<br /> FUEL. I NG PLAN _ NORTH /TUI IIIA �M
<br /> I" . 10 II 0
<br /> LLD! (Y)
<br /> IO
<br />
|