My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2003 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
9015
>
2300 - Underground Storage Tank Program
>
PR0521738
>
BILLING 2003 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 11:33:09 AM
Creation date
11/7/2018 8:23:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2003 - 2009
RECORD_ID
PR0521738
PE
2371
FACILITY_ID
FA0014762
FACILITY_NAME
JD Service Station, Inc.
STREET_NUMBER
9015
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
01
SITE_LOCATION
9015 WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WALNUT GROVE\9015\PR0521738\BILLING 2003 - 2009 .PDF
QuestysFileName
BILLING 2003 - 2009
QuestysRecordDate
12/12/2016 7:51:59 PM
QuestysRecordID
3278051
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQ`16iiiiiAl COUNTY ENVIRONMENTAL HEALTI,..:PARTMENT <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN - PAGE 1 <br /> M01. <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> M03. <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only). ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - <br /> 1 •M03. <br /> FACILITY NAME J D f'Q�23/ 3 CIL- 1 I �lJ � �' <br /> � ,{- MO3. <br /> FACILITY SITE ADDRESS `Y (,'�'r "1 ' ay#7fCV? M� Cm l(h�aYn <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Moe. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent Such work must be performed by qualified personnel. Moi_ <br /> MONITORING EQUIPMENT IS SERVICED '❑ 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan ma ,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MI0 <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) Mu <br /> SECONDARY CONTAINMENT IS: [3a.DRY R b.LIQUID FILLED E] c.UNDER PRESSURE ❑ d.UNDER VACUUM M11 <br /> M12. MODEL#: <br /> PANEL MANUFACTURER: Mia. <br /> Mto. MODEL#(S): <br /> LEAK SENSOR MANUFACTURER: <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TA M1((S) MODEL#: MIT MM PANEL MANUFACTURER: MIT <br /> Mfg. MODEL#(S): <br /> IN-TANK PROBE MANUFACTURER: Mzo <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYMIGHTLY El c.WEEKLY Mal <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M32M23 <br /> PROGRAMMED TESTS: [I a.0.1 g.p.b. El b.0.2 g.p.h. C] c.OTHER(Specify): <br /> Mae <br /> [13.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 E] b.STATISTICAL PER 23 CCR§2646.1 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 Mzs <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 Mze Mn <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Re,ir:agency agPnnn9 <br /> M28. <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> Mia. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHODS)(Check all that apply) <br /> I.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)lfRENCH(ES)AND OTHER SECONDARY CONTAINMENT M31. <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE [Id.UNDER VACUUM W3 <br /> PANEL MANUFACTURER: M32 MODEL#: <br /> �6MODEL#(S): m33. <br /> LEAK SENSOR MANUFACTURER: Mae_ <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? <br /> [I a.YES ❑ b.NO <br /> WILL FAILURFJDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? <br /> ❑ a.YES ❑ b.NO Mn. <br /> TESTS AND RESTRICTS OR SHUTS OFF <br /> ❑ 2.MECHANICAL LME LEAK DETECTOR (MELD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED Mag. MODEL#(S): M39. <br /> MLLD MANUFACTURER(s): <br /> [1 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> Mo MODEL#: M41. <br /> ELLD MANUFACTURER: Me±. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. Mai. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? E] a.YES ❑ b.NO <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN. ❑ <br /> a.YES ❑ b.NO Md0' <br /> ❑ 4.INTEGRITY TESTING Mas. Mea. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ❑ S.VLSUAL MONITORING DONE: ❑ a.DAILY ,RD�b agmq Wp J 11 ARo for,00n,i�g of unburied mergercv ge�e.MONTHLY&EACH uor Ne ppig�Y�Sc§S±s1.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) M48 <br /> ❑ 99.OTHER(Specify) <br /> o7n3/o3 <br /> SJCEHD-d(07/03)-1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.