SUMMARY OF THIRD AND FOURTH QUARTER ACTIVITIES <br /> The "workplan for Completion of the Site Assessment Plan and <br /> Pollution Control and Mitigation Plan" (WorkPlan) task ac- <br /> tivities from February 12 through August 1988 are summarized <br /> below: <br /> Task 1--Onsite wells: Completed first quarter. <br /> Task 2--Offsite wells: Six new locations for groundwater <br /> monitoring wells were proposed. The property owner has been <br /> contacted and M&B is awaiting access approval. <br /> Task 3--Groundwater monitoring: Water levels were measured <br /> in March and May. Groundwater samples were collected from <br /> 24 wells and analyzed for the regular suite analyses. Next <br /> quarter groundwater sampling is scheduled for August 22 to <br /> September 2 , 1988 . <br /> Task 4--Aquifer Testing: Aquifer tests were completed. <br /> Analysis of data is complete and a technical memorandum sum- <br /> marizing the data, analysis, and conclusions were submitted <br /> August 1988 . <br /> Task 5--Hydrogeological characterization: Scheduled to begin <br /> in April 1989 . <br /> Task 6--Background Soil Sampling: Completed second quarter. <br /> Onsite soils data used in lieu of offsite samples. <br /> Task 7 , 8 , and 9--Soils Sampling: Completed second quarter. <br /> Task 10--Tank Integrity Assessment: Based on the tank in- <br /> tegrity assessment, two underground fuel storage tanks are <br /> being replaced by above grade tanks. Agreement of how to <br /> decommission the remaining, no longer used underground <br /> creosote/oil unloading tank has been reached. <br /> Task 11--Dioxin Assessment: State comments received in <br /> letters of January 29, 1988 and May 3 , 1988 were responded <br /> to in the April 1988 workplan and May 27 , 1988 response to <br /> comment letters. Sampling is scheduled for April 1989 . <br /> Task 12--Preliminary PHERA: Completed second quarter. <br /> Task 15--SRWCF Treatability Assessment: A technical memo- <br /> randum, submitted August 1988 , presenting an updated <br /> analysis of the data collected during the third and fourth <br /> quarters. <br /> Task 16--Sewer Line Integrity Assessment: Completed second <br /> quarter. <br />