Laserfiche WebLink
{ • ONAL EXECUTION COPY <br /> D. A Summary Report presenting the The later of <br /> integrated results and interpreta- January 28, 1985 <br /> tions of the Groundwater Assessment or 22 weeks after <br /> Plan and Soils Assessment Plan. the Company's <br /> receipt of final, <br /> formal State <br /> approval of <br /> the Plans by the <br /> Designated State <br /> Representative <br /> E. Pollution Control and Mitigation Plan <br /> which includes: <br /> 1. Assessment Report containing: Within twenty (20) <br /> working days after <br /> a. Identification and assessment submission of the <br /> of appropriate process changes report in D above <br /> and/or controls required <br /> to prevent further contamination, <br /> including all areas <br /> previously addressed as within <br /> the permitting process; and <br /> b. Identification and assessment <br /> of alternatives to clean up <br /> and/or contain contaminated <br /> groundwaters; and <br /> C. Identification and assessment of <br /> alternatives to clean up and/or <br /> mitigate contaminated soils; and <br /> d. Analysis of the scheduling consider- <br /> ations associated with the alterna- <br /> tives addressed in (a)-(c) above. <br /> 2. Selection Report containing: Within thirty <br /> (30) working days <br /> a. Design basis report of the after receipt of <br /> selected alternative to final, formal <br /> clean up, contain, and/or State selection <br /> mitigate contaminated ground- and approval of <br /> water and soils; and the selected <br /> alternative(s) <br /> b. Design basis report of the by the Designated <br /> selected process changes and/or State Representa- <br /> controls required to prevent tive <br /> further contamination, including <br /> all areas previously addressed <br /> as within the permitting process; <br /> and <br /> 18 of 23 t <br />