Laserfiche WebLink
FEE WORKSHEET PER EACH FACILITY FACILITY <br /> WASHINGTON ST. STOCKmGiN <br /> DBA STOCKTON PORT DISTRICT ADDRESS <br /> 2201 W. <br /> MAILING ADDRESS P .O .--BO—X- 2089 STOCKTON CALTFORNIA 95201 <br /> 1. New Facility or Addition <br /> a. First Tank $180. <br /> b. Additional Tanks (# <br /> Additional Tanks x $50) <br /> 2, Operating Permit Application/Annual Inspection Fee $150 . 00 <br /> a. Existing Facility and 1st Tank @ $150• 200 . 00 <br /> b. Additional Tanks (#�� <br /> Additional Tanks x $50) <br /> 3, State Surcharge (per tank) (Due with Permit Application, <br /> on renewal or amendment of operation permit and temporary closure) 330 <br /> ($56 x Total # 6 Tanks) <br /> 4. *Temporary Closure (per tank) Underground Storage Tank in which <br /> storage has ceased but where the owner/operator proposes to <br /> re-use tank within 2 years. 80 . 00 <br /> (# I Temporary closures x $80) (See above #3 to calculate surcharge) <br /> 5. *Permanent Closure (per tank) Underground Storage Tank in which <br /> storage has ceased and where the owner/operator has no intent <br /> of re-using tank within next 2 years. <br /> (# Permanent Closures x $90) <br /> Total Fee Due $766 . 00 <br /> Total Number of Tanks 6 <br /> San Joaquin Loea1 Idealth District. Enclose this worksheet <br /> Make n-'.1 fees payable to <br /> with your check. <br /> EXAMPLE - Annual Fee for Facility with 4 Tanks <br /> (1 regular, 1 unleaded, 1 supreme, 1 waste oil ) <br /> $150 <br /> 1a. Existing Facility & 1st Tank <br /> 150 <br /> b, 3 Additional Tanks x $50 <br /> 224 <br /> 2. State Surcharge, 4 Tanks x $56 <br /> Total Number of Tanks 4 <br /> Total Fee Due $524 <br /> *Both closures will be conditioned. Contact a Health District Representative. <br /> -86 <br />