My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2300 - Underground Storage Tank Program
>
PR0231282
>
REMOVAL REMOVAL 1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:42:55 PM
Creation date
11/7/2018 8:36:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 1993
RECORD_ID
PR0231282
PE
2381
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WASHINGTON\2201\PR0231282\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Describe the method that will be utilized to purge and/or Inert the tank(s): . <br /> le rinse rocedure dr ice will be added at the-[ate of-15 1-�. <br /> After tri <br /> er 1000 le ca acit for diesel or oil arra 30 lbs. er1000 al capacity ' <br /> gasoline. <br /> b. Tank/Piping hauler: <br /> Name Jim Thor e Qil Inc./ DBA Rich-Mart Construction- <br /> Address-15-11q. <br /> onstruction.Address3 1Id. Beckman Rd. I City Lodi Zip 95240 <br /> Phone No.( 209 ) 368-6175/ 462-4581 <br /> Hauler Registration # (if hauled as hazardous) 266 <br /> c. Tank/Piping Disposal Site: <br /> Name Schnitzer Steel Products <br /> Address 12000 Folsom Blvd. City Rancho Cordova Zip_ 95742 <br /> Phone No. 1(1 6 ___) 98 .4810 <br /> EPA ID# (if transported to a permitted TSI? facility) <br /> 9. Describe, In detall, how the soil and/or water sample(s) beneath the tank and piping will be obtalnedt <br /> After tank (s) has been removed contractor will di approximateW 2 to 3 Samples <br /> under the fill or um end or ends into undisturbed soil with the bac hoe• <br /> will be taken at the direction of SJP[IS/Ei]D re resentitive from the backhoe enclosed. <br /> Sam lin rotoco] is outlined on "Sampling ProtocolFor Routine Tank Removal enclosed. <br /> to, Describe how the excavation will he backfilled with suitable material upon removal: <br /> Back fill of the excavation will be com feted at the appropriate time during the <br /> ro 'ect. A determination of the most cost effective method will be made and <br /> undertaken. Materials used ma be sarid loam ea ravel or other ma erxa . <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> Heavy duty plastic sheeting. <br /> b) What will be the final destination of the excavated stockpile? <br /> Spoil disposistion decisions will be made after sample analyses are studied <br /> and con amine ion. eves are eterm1ne . <br /> e) Contaminated Soil Hazardous Waste hauler: <br /> Dillard Trucking Itanler Regt.�tlon, dE 1715 <br /> Name � - <br /> Address 3291 Byers Rd. RT. 1 bx. 73 City Byron, Zip 94514 <br /> Phone No. 5{ — 1� 634-6850 <br /> Page S <br />
The URL can be used to link to this page
Your browser does not support the video tag.