My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2300 - Underground Storage Tank Program
>
PR0231282
>
REMOVAL REMOVAL 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:42:01 PM
Creation date
11/7/2018 8:37:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 1987
RECORD_ID
PR0231282
PE
2381
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WASHINGTON\2201\PR0231282\REMOVAL 1987 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t, <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location <br /> FORT OF SIOCKTON <br /> PORT OF STOCK-MN Phone No. 209-946-0246 <br /> Owner <br /> Contractor JIM THORPE OIL INC Phone No. 209-368-6175 License No. 495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> X 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(112) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (314) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the 'Uniform Building Code <br /> Appendix Chapter 70. <br /> * BARRY H. NICE;:OLSON <br /> ame (Print) <br /> * EIWIR(7Nll'lEl NAL SPECIALIST <br /> rte t <br /> * <br /> 4�;�ignamre <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.