Laserfiche WebLink
• • yVUwCP3 <br /> f� rp <br /> STATE OF CALIFORNIA 'a <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED O <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑f '6 TEMPORARY TANK CLOSURE ❑ B TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# (SJ 1 B. MANUFACTURED BY: d <br /> C. DATE INSTALLED(MO/DAYNEAR) ✓I k-- D. TANK CAPACITY IN GALLONS: <br /> II.TANKCONTE S IFA-11S MARKED,COMPLETE ITEM C. �_-y � <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. FJ UN FADED 3 DIESEL <br /> O 4 GASAHOL GULAR ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY L; RRODUCT ❑ 1bUNLEADED IIUM ❑ ❑ 7 METHANOL <br /> 5 JET FUEL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER 17:1 95 UNKNOWNSYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) [�R <br /> ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B. TANK POLYVINYL CHLORIDE 7 ALUMINUM 8 100% METHANOL COMPATIBLE W/FRP <br /> 6 <br /> MATERIAL ❑ 5 CONCRETE ❑ ❑ ❑ <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL �NOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED [: 1 NOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? VES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE KNOWN ❑ 99 OTHER – <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV,PIPING INFORMATION CIRCLE A IFABOVE GROUND OR U IF UNDERGROUND,BOTH IFAPPLICABLE <br /> A. SYSTEM TYPE 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINTRENCH A5 UNKNOWN A U 99 OTHER <br /> ED <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U� UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION [:] 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 9 MONITORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> 7❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING [-] 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING F77 INTERSTITIAL MONITORING ❑ 91 NONE NKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES NO <br /> SUBSTANCEREMAINING GALLONS INERT MATERIAL? ❑ ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 6 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMB <br /> COUNTY# JURISDICTION# ACILITY# TANK ?pNZZ <br /> STATE I.D.# 11] 2 5 7 6 X 5 7 6 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATETERMITE ATIOND <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> ® I// FOB B.RS <br />