My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2300 - Underground Storage Tank Program
>
PR0231756
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:01:51 PM
Creation date
11/7/2018 9:00:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231756
PE
2361
FACILITY_ID
FA0006343
FACILITY_NAME
ALPHA FAST GAS*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
01
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\2358\PR0231756\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rte ' 11RR is '93 03123PM.ULqMgR INC, • P. 13/16 <br /> I <br /> 9AN JOAQUIN COUNTY <br /> e; "-r�l•s COMMUNITY DEVELOPMENT DEPARTMENT <br /> Saa�IIsIA :i <br /> 1010 E.WELTON NVB„STOCKTON,:A 90205 <br /> DEVELOPMENT SEIMCES PHONE 12001 155.3120 <br /> PLANNINO PHON412081155.3120 <br /> BUILDING PHONa 12091456-3123 <br /> NEIGHBORHOOD PRESEWATION RMQN@ (2091 400-3031 <br /> BACKZILL EXCAVATION CERTIFICATE <br /> m <br /> Project Location 23 rc Loo 2 D <br /> Own ar UL TR A, lM Dnz r :T5;;c c. Phone No. 2, O°t - -S'P 3 - S-S"�f z <br /> contrtactor CIuLAs.,,,Phone N0. fly -3±z (0' License No. 8' <br /> INDICATE METHOD OF RACXFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's compaction Report within 30 days of project <br /> "— complation, or <br /> 2. submission of verification, e.g. load ticket/ within 30 days of project <br /> completion that one of the following materials was placed in the excavation in <br /> 1211 liftss <br /> A. Pea gravel - smooth, rounded material not more than one-halt (1/2) <br /> inch in diameter. <br /> S. Crushed rock - self-compacting material not more than those-quarters <br /> (3/4) inch in cross sectional measurement, (Use of crushed rock <br /> will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes mads of poly rsain glass or <br /> similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Enginaerls Compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix Chapter 70, <br /> ML C4A-FL <br /> Name (Print) <br /> Rrz. L FJ- e <br /> gnature <br /> * Shall be the responsible managing employee on the license or authorized <br /> agent. <br /> 6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.