My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2300 - Underground Storage Tank Program
>
PR0231756
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:01:51 PM
Creation date
11/7/2018 9:00:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231756
PE
2361
FACILITY_ID
FA0006343
FACILITY_NAME
ALPHA FAST GAS*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
01
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\2358\PR0231756\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ultramar <br /> Ultramar Inc. Telecopy: 209-584-6113 Credit&Wholesale <br /> RO Box 466 209-583-3330 Administrative <br /> 525 W.Third Streel 209-583-3302 Intormalion Services <br /> hanforC.CA 93232-0466 209-583-3358 Accounting <br /> (209)582-0241 <br /> December 3, 1992 <br /> Ms. Carol Oz <br /> SAN JOAQUIN COUNTY. 7 t 22 <br /> ENVIRONMENTAL HEALTH � J I- <br /> I ',L- Hr 4,1-T 0 <br /> P.O. Box 2009 V-i*t,- <br /> Stockton, CA 95201 <br /> Dear Ms. Oz: <br /> RE: Beacon Station 1419 Beacon Station #494 <br /> 2350 Waterloo Road 2185 E. Fremont <br /> Stockton, CA Stockton, CA <br /> Beacon Station J474 <br /> 3440 E. Main Street <br /> Stockton, CA <br /> Regarding tank replacements at the above referenced sites, I am <br /> requesting that the Authority to Construct be extended. <br /> While we expected to complete these projects this year the Real <br /> Estate deal including these sites fell through. <br /> Construction on the above referenced sites is scheduled to begin <br /> during the first quarter of 1993. <br /> Attached are site maps identifying the monitor wells that are located <br /> on thccc zltez. <br /> Should you have any questions, please do not hesitate to contact me <br /> at (209) 583-5542. <br /> Very truly yours, <br /> ULTRAMAR INC. <br /> Peter Huke <br /> Project er <br /> PH/mas <br /> BEACOPAT <br /> rkib' N <br /> A Member of the Ultramar Group of Companies 41 Quality and Ser%icu <br />
The URL can be used to link to this page
Your browser does not support the video tag.