Laserfiche WebLink
r� <br /> f. 4Sr4/N <br /> T � <br /> SB-1 + <br /> MW-2 <br /> + 1 <br /> Pump SB-2 <br /> Islands <br /> BIW-3 <br /> SB--4 Q �—_----{ I <br /> I U/G TANKS <br /> SB-5 Q I---_—_-I <br /> I <br /> -------i <br /> MW-1 <br /> SALES SB-3 d <br /> AREA 0 <br /> I <br /> Ic <br /> 4" lateral sewer line <br /> I <br /> I <br /> I <br /> 1 <br /> LEGEND <br /> Soil Boring Location FIGURE 2 <br /> C) Proposed Soil Boring Location SITE MAP <br /> Beacon Station #474 <br /> Proposed Monitoring Well Location 3440 East Main Street, Stockton, California <br /> Project No. Drawn <br /> Approximate ULT12.01 EAF 6/14/92 Acton a Mickelson van Dam, Inc. <br /> Scale Consulting Scientists, Engineers, and Geologists <br /> 0 30 File No. Prepared <br /> 2UL1201 HEH 5090 Robert J. Mathews Parkway, #4 <br /> r Base clop derived fromEl Dorado Hills, California 95762 <br /> Groundwater Technology, Inc. 1" 30 ft Revision Revhvred <br /> Report of Investloation (9'16) 939-7550 <br />