My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2300 - Underground Storage Tank Program
>
PR0231756
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:01:51 PM
Creation date
11/7/2018 9:00:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231756
PE
2361
FACILITY_ID
FA0006343
FACILITY_NAME
ALPHA FAST GAS*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
01
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\2358\PR0231756\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUM TANK PROGRAM OFFICIAL INSPtTION REPORT <br /> SAN JOAQUIN HEALTH DISTRICl711" <br /> 1601 E. HAZELTON AVE. <br /> STOCKTON, CA COUNTY NAME Q �� Q PHONE NO. 468-3423 CONNTY # <br /> SITE NAME: 1.JQ��/ f .UZGL�IYICU(� INSPECTION DATE: <br /> �/Q0 <br /> SITE ADDRESS: ? � CITY/STATE/ZIP /�`� ✓ G� <br /> CHANGES SITE/OWNER/PERMIT? YES NO TANK / TANK TE ANK � COMPUTER <br /> TANK <br /> FORM A AND/OR B SUBMITTED? UMBER MPUTER UMBER UMBER <br /> UMBBERER M <br /> U � UNUMBER <br /> TYPE OSA A IN�SPE,O-fI N SITE COMPUTER#� P R# R# P R# PER# <br /> ��w v �/ E DATE E P.DATE E/ DATE EXP.DATE <br /> TANK CONTENTS <br /> OPERATIO AL TANK MAJOR MINOR j f � <br /> PERMIT TO OPERATE 1 2 <br /> CHANGE IN CONDITIONS TO OPERATE 3 4 � ---------------� <br /> APPROVED CONSTRUCTION 5 6 <br /> WRITTEN MONITORING PROCEDURES 7 8 <br /> APPROVED MONITORING SYSTEM 9 10 - -- "- <br /> MONITORING SYSTEM 11 12 re -_- - <br /> © - -X13 <br /> APPROVED MONITOR FREQUENCY 13 14 -- , <br /> MONITORING RECORDS MAINTAINED 15 16 <br /> ACCESS CASING SECURED 17 16 <br /> PIPING 19 20 <br /> INVENTORY RECONCILIATION 21 22 <br /> TANK GAUGING 23 24 - <br /> APPROVED RESPONSE PLAN 25 26 <br /> UNAUTHORIZED RELEASE OCCURRENCE 27 28 - ""'---- <br /> SAMPLING 29 30 - <br /> APPROVED TANK REPAIRS 131 32 - <br /> UNAUTHORIZED RELEASES REPORTED 33 34 _. <br /> SAFETY HAZARD ------- <br /> CONDITIONS ABATED 37 <br /> TEMPORARY TANK CLOSURE <br /> REMOVAL OF RESIDUAL 36 39 - fl- <br /> PERMANENT <br /> FLAMMABLE VAPORS REMOVED 40 ACCESS LOCATIONS SEALED 41 42POWERDISCONNECTED OWNER/OPERATOR MONITORING 4545 TANK CLOSURE <br /> REMOVAL OF RESIDUAL MATERIALS 46 47 - <br /> PIPING 48 49 __ ---- '--- <br /> FLAMMABLE VAPORS REMOVED 50 -- <br /> UNAUTHORIZED RELEASE 51 52 >/ ------ -- ------ <br /> SAMPLING 53 54 <br /> IMPROPER ABANDONMENT 55 56 A <br /> THE MARKED ITEMS REPRESENT VIOLATIONS AND MUST BE CORRECTED AS <br /> SYSTEM STATUS(MUST MARK ONE) FOLLOWS: - <br /> AJOR 57 MINOR 8 NO 59 <br /> VMIOLLtff VIOL. ❑ VIOL.❑ <br /> OFFICE: INSP: RECEIVED BY: <br /> TITLE'5eyn H's PHONE: BECK: <br /> 5/88 C <br /> HUT-3 ORIGINAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.