My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 1993 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2300 - Underground Storage Tank Program
>
PR0231756
>
BILLING 1993 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 12:52:46 PM
Creation date
11/7/2018 9:01:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1993 - 2012
RECORD_ID
PR0231756
PE
2361
FACILITY_ID
FA0006343
FACILITY_NAME
ALPHA FAST GAS*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
01
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\2358\PR0231756\BILLING 1993 - 2012.PDF
QuestysFileName
BILLING 1993 - 2012
QuestysRecordDate
8/7/2018 7:50:20 PM
QuestysRecordID
3956920
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORAGETANK <br /> RESPONSE PLAN - PAGE 1 One forth er facilit <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Rol <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) - 1. <br /> BUSINESS NAME(Same assFACILITY NAME) 3 <br /> rl . <br /> lXIIr1 �1 v " <br /> BUSINESS SITE ADDRESS 103 1 BUSINESS SITE CITY 104. <br /> a3 b2ON-) C �k oto CA GS�er� <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed m hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> D We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Com lete on!y i n licable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> R R-r63S RIO. e, ^TI Ue Rao. <br /> �l I.S�/� 1� RIL �61/S)r � <br /> 1� R2I. R31. <br /> 6-Au b)bA" RIZ t3_ }-nNla <- <br /> lLll` R'-2. 412. <br /> R13, R23. 433. <br /> R14. R24, R34, <br /> RI5. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40. TITLE R50. <br /> yll,( JQ C10 lS it P47_7 <br /> NAME NC yam^' a41. TITLEJAwl H��^ � Rs1. <br /> NAME Raz TITLE l►GI� R52. <br /> 7br13 Piro TW,��N6uyE� st_ <br /> (AP -'V1JJ0A <br /> NAME Prl •lo W ttay4i 1� R43. TITLE VfiJ�w"�i opawre� R53. <br /> V. MONITORING INDICATORS G� <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ❑2. INSPECTION BY QUALIFIED PERSONS E13. RECALIBRATION OF EQUIPMENT Rho <br /> ❑99. OTHER(Specify): R61. <br /> UN-022B-113 www.unidoes.org Rev.04/02/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.