My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2300 - Underground Storage Tank Program
>
PR0231756
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 4:59:40 PM
Creation date
11/7/2018 9:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231756
PE
2361
FACILITY_ID
FA0006343
FACILITY_NAME
ALPHA FAST GAS*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
01
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\2358\PR0231756\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
8/8/2018 4:42:56 PM
QuestysRecordID
3958640
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testingl5ervicing <br /> Software Version Installed: 329.01 JUN 10 2016 <br /> Com late the following checklist: <br /> ® Yes ❑ No' Is the audible alarm operational? " <br /> 0 Yes ❑ No' Is the visual alarm operational? <br /> 0 Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No` If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> 0 N/A <br /> ® Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shutdown? (Check all that apply) 0 Sump/Trench <br /> Sensors; 0 Dispenser Containment Sensors. <br /> Did you confirm positive shutdown due to leaks and sensor failure/disconnection? 0 Yes; ❑No. <br /> ❑ Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> ® N/A installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent of tank capacity <br /> does the alarm tagger? 0% <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify speck sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ❑Yes' ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach setup reports,g applicable <br /> ® Yes ❑ No' Is all monitoring equipment operational per manufacturers specificafions? <br /> 'In Section E below,describe how and when these deficiencies were or will be corrected. <br /> EH FATIMA ON SITE . DISP 3-4 FLOAT FAILED . FULL OF WATER IN FLOAT . I took apart float <br /> cleaned and tightened bolt where leak was then passed .fixed on site . ALSO HAD TO ADJUST 87 AND <br /> E. Comments: 91 LD ..ALSO HAD TO ADJUST-7-8 91 FLOAT THEN PASSED . <br /> M onitoring System Certification Page 2 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.