Laserfiche WebLink
LUU V <br /> D. Results of Testing/Servicing ` <br /> MAY 14 2015 <br /> Software Version Installed: 329.01 `` g 1 <br /> om tete the following checklist: IV NMENTAI <br /> ® Yes ❑ No' Is the audible alarm operational? <br /> ® Yes [] No" Is the visual alarm operational? <br /> ED Yes ❑ No" Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> 0 Yes ❑ No" Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® N/A <br /> ® Yes ❑ No` For pressurized piping systems,does the turbine automatically shut dowry if the piping secondary containment monitoring.system detects a leak, <br /> ❑ <br /> NIA fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check all that apply) ® Sump/Trench <br /> Sensors; Z Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor fall ureldisconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No" For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br /> ® <br /> NIA installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent of tank capacity <br /> does the alarm trigger? 0% <br /> ❑ Yes Z No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below.. <br /> ❑Yes' Z No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No` Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No' Is all monitoring equipment operational per manufacturer's specifications? <br /> `In Section E below,describe how and when these deficiencies were or will be corrected. <br /> NOT ALL DISP WORK. GETTING NEW DISP NEXT MONTH. STACY WITH SJV E.H ON SITE . <br /> E. Comments: CLEANED DSL OUT OF DISP SUMP AND TIGHTED HOSE THAT WAS LEAKING <br /> M onitoring System Certification Page 2 of 4 2121107 <br />