Laserfiche WebLink
,. it ...__..®_,.,,..:....-.�,...,.„...t.m�.e.-.m-..--•..:.--•,-•..-.-.�.-,,.�_..._.__..::.:..T,,,n.,...,. ;.,,....�. ....-._.,,..�».,:.. .. _.,_,�.....,...,,_-_._ ____,-a�.-,+..,.-,..��...,-,:...._.�.....,.,J.:;„.....,....._.....,,_.,�.z._.._..,....:..m._ ..,-�_.Pv_,:...__....,.....,....:.m,,.__........_...W_-...-...,,.,._._.,.,:., ....�......,�.. <br /> :. .._,�,.__•..�._-,_.e ..--_...a----�•-„ ..--�. _ a Q f4R DETAIL OF TANK SLAB .,.,m�.=....,�..-,..-.,_....._,..-..u�_,.,......_._..„r.,--�m..�...............�..,..._.-...,.,.v:.... .w...,....,....:_..._....._,.......m_„m.v <br /> aPECIFICATIONS <br /> ov a SEIE $HcE F-t 1 - M1 <br /> ...:..: _ <br /> `` ----PEA GRAVEt.. <br /> _ 'u BACK F`L i, 1 S F%,AVATION ANO BACKFLL <br /> Zit .} F Se.$' { <br /> QIP. 4Z I A. EXCAVATION! If,ifnerpected tater condition cr rock is enJounterad, jrnme .e'y r,;,ntact U e <br /> CheY on RPP...for Instrucnony belore proceeding with the exccvaflon. F. Ac.t Et f+NLL �JAi ..i. „aopim otic taI',k <nd !Ifhn s duan, toe t.na is f - <br /> -.. -' .-s -r.-i w '"'=-, -•-- "-m .. �-J -� r-L -+ -+, _:-z. c- c „ ,., t 3.. 3 7 .: V o bt5 Go.,a J g .i .q..l• <br /> TANrC HOLE $ljC IN STABLE SOIL; Size excavaton perimeter to allow 24 -1 vmum Betw,.ed t nt exven •type Band°prassur,ied spray un k. )},e tes-l.coo snoEt be a hi h foamin 'coo � h � I <br /> ,'easiP rf irc. antacL with aM1 air look n fha. took hul wgP't bub-lo '� ' 9. -p t at butt e.s <br /> ;and. 24 minimum between sides and end caps and the wall of the 1rnk hale. II: 4 4 due td dspensing from the pressure <br /> TANK HOLE SIZE hN 03TA81,E 'OIL oPP "afar. Acciptoble soups ore: <br /> '� . '- • 1, Unstable tiol s,defmod ashaving 'aSs than 750 hs /sq it, aohesan, as calculated from on . .$epnr ,jest'.Concentrol9 ' <br /> uaconflned compression.fest, or so fs with on ultimate. beorng cepoply rf less than 3,500 - - :�I*1waY Loa'Nigh Soap" <br /> r y '. or roved e . <br /> - c onsdare unstable soils. wamp or landfill where lot is soft ac I , and Leak 4eteclaP <br /> Slee excavation S 3 ore A 00 couthlt <br /> 2 d.,. Sepei-leor�To glow 24 peat, Swears <br /> between tanks Ond a ranimum of hot the fork G PRE.-IN TALL NuN R <br /> ,. diameter between the tank sidee/end Sops and the wait of the tank hole. r -a r •ATO; everPREp, k TEST, AIR Ex dart' care I).o b¢ used around and near me <br /> -� p ecce zed to Never presswMe the a¢sonticry (outer) lank wthnutor <br /> ..._. - ) Pre^s„rIz ng the p, y <br /> 3. Filler (tante ;till be may be <br /> Ise took hole for FRP tanks n unsl k hole, <br /> (inner) took <br /> / l 4. Permonegt chorine moY:4a' Used to stabilize the wells of the tankhoh, at chis discreP,an of t6• 1. Primary (Inner) 7`ock Tas t. <br /> A ! Connector Ond/or.Chevron Rep, If permanent sharing is used, fogaw .Stable Sod” site cr,tar!.a. ' T� n' <br /> U ` I 4" ALUMINUM FILL TIJB- /POST I`,E SHUT OFF' 42 Refer to 'Alfernata packfill Materials', below. ,. Ighte oil lank fillings,,Locate a pressure ;gouge ,n the vert/man tar firing ,n the seconaarq „ <br /> Y. 1 D DEPTH OF TANK HOLE (resso et tank, 4AieCQ a second pressure gage at q filling In the.menway and connect the o1r <br /> ' a I ' 1: Contractor.Iq' responsible T f estcblishin the tank hors, <br /> ,, r =' i,4 ,; ,: - P. ase:to this Some ,itbng, Pressurrte lhe,pnmary, (Ione+). tank to o minimum 4 psi, <br /> u- h — 1 MONITOR PROBE TO LOW Y'7 n - ,..4 ,_g e n, . as depth, .on,,de ,no f e ;.,.i r of pk.ng. . mpxmun 5 Rs, Monitor the pressure, gages a minimum of 1 hour. Theri 'should 6 no. pressure <br /> 1 V �. .runs to Lh.. purrp backs and v nt risers, p pe Kure) ,eoth, yord k,of=e and l.la „ ny -.rilerD incr ease J, the s<coddor @ <br /> o _ I j ENO OF LANK. .(Moscone of the Remove;Pump opA,liig), - y•(pufer) lank Soap al( look fi tt kgs <br /> y I I o FRP' The n, mmum depth of caved is 3' 0' and the ma+,mum is 7'- 0" 7, Sefondary (external) Tpnk rest, - <br /> SLOPE TANK I' IN ib` - Maintain the pressure In the primary tank. ,Free the hose from theservice fitting by cutting the <br /> R.I DOWN TOWARDS FILL ENO C, SAFETY REQUREMENT• neon be Insert the hose into the Quick.Disconnect check valve (Bund of the top fathe segrvice <br /> - .nfGl n took hai9 excavation below the fitting) Fh e wilt allow air to tronrgfer from the primaryto secondary ary tank Pressurize to 5 P$V; <br /> No shall e e @ ft deep O,et unless the woi s era shored <br /> I I or side sloped'hs prescribed -by current OSHA re,ulol.iona Na ekce t'icns. State r loses re uireMenls Add or remove: air vie me supply D ,conn Disconnect, <br /> theded and.supply <br /> in the pr¢ssw.e to stabilize Close <br /> �I that;are more'r.Slr'ct s' than Company spec fcOUOrs ore to be adhered to os thou+ specified in lh¢ vnl,e On, the to manifold. Disconnect. the mr supRly ire. !don icor the pres9Vre for one hour. <br /> I Company specifications The Contractor IS responsible for any desk n, materials' e ut lmenl ¢mils' Soaa the "tire exterior of the tank one :watch far dative air nobbles which indicate n leak. <br /> l I etc„4for pl^oriiig or side Sloping a note �., 4 „V P r WI,°.n the, fest is complete,.carefully release the air pressure from, "the tank by opening the supply <br /> F!LCA90 6ACi(PILLI - ypive, Theairsupply line, already should hove been disconnected When the ar, flow .from 'the Supply <br /> All fill mistenaleh It be of granular nature, .free from vejetafton and extraneous material Chevron Volvo stop_, remove the test.; mandold. <br /> s P s p v approve Mite material before d ig.spread, Spread mot. IOI io Lifts riot to exr•:ed POST-INSTALLA)ION PRFSSURF TEST, AIR, <br /> Forts, hail nspest cnd n , <br /> -� {-• 12'.inches and amp thoroughly. When regmred by 'acct code, Contrci;r swat p,svvde o rOmpoetco - 5'. Primary Iiner) ;Tank Test Perform this !esk-wit TO, tank. risers and fithn alt h <br /> test fee ce r gs. aO ed Tighten elf <br /> • �Tf -` -"""* rh icoUpn of fill. tank f,tl ngs. Locale a pressure gouge in one of,the annular space. mo�dor fitfings in the <br /> SEE GET A BELOW: .SEE DET_8 BELO1W ` ,IFFE l ,,. t 4 ALLAST; secondory (outer) tank Locale a Seton <br /> 1 1-�i- I- 8 ) d iaot the gauge with o'8 psi pressure relief, to one sof <br /> ,r <br /> STEEL PLATES UNDER EACH OPEw'vG e the primary(inter) tank Tilpngs and connect the air pressure hose. t0 this sum¢. fitting,,Pressurize <br /> 2"-0" 9Y TANK MANUFACTURER _ 2M1'-0 1 4' � A MATERIALS � ;nepnmory (igner) tank 16 rs minimum ,,>I,4 psi (maxi,npm. 5- sl . Soap' ell tbnk (iltin s and <br /> / 2. 0 should <br /> '( q. <br /> MIN. _ --__ VERIFY W/ TANK MFG:, R--- --�� MI,V, Water is la•bo,4sed os d solid t under con 9dlons di.ire Lal as( Isa(=gu red ":mentor the PrQsura gouge for y minim+m'.at T/2 hear,, lacer¢ rhould be no pr¢ssuhe increase a <br /> ` 8 DRY.HOLE CONDITION the.secondary touter) funk• ' ; °. i •` <br /> ----------- -------------- ----- - --- - - --- - - -- - -- ---- - Tanks wAhbeck6fi to lop ?Blanks, must bo ballasted if Ihere is on chance .that surface or 2 Secondary (Outer) Tank Test, Disconnect ha air supply b m m in r <br /> q p q y took Pressuri,za fha secandpr k ) 9 PP y ut 9 Sa the pressure on the pnmgry <br /> subsurface sutler «il enter the tank hole.to a he lh of 23' or rester oboe the bottom of the." y (Ou er ,link'using a flexible air hose manifold Connect a pressure <br /> , D 0nn RG A TANK <br /> D c 3 tanks has8 from the' primary tank�to the chop's, space monitor fitting '„ _ , <br /> 10' DIA. 12, w GAIT. FIBERGLASS I AN N AND ��(�/SVATI�N SECTION CAUTION - So NOT, BALLAST TANKS,UNTIL BACKFIlI IS'TO ROP OF TANK,. Pressurize the secondory tank by open,nq the manifold valve ¢etweon the ` <br /> '-0- - WET.HOLE CONDITION. ` , . primary and secondory tank. If negessorp;Orin pressure of both tanks to a m imum� of 4 psi <br /> C, � g <br /> ' Attempt to pump valor from the tank hole, to mmnlain o Cry Hole Condition'. If wichole to optbin (makmum 5 psi) by reconnectng the dersupply to lh9,pnmory lank, <br /> - '�' • -��'+ �+�'"-��"""- "" 1e'"�-+�'�'�""' o 'Dry full condition', Chevron: Rep,_ I$ to be nOUF¢d qni. v0 determine the course of Ostia n. tp be Mon,lpr, the pressurn (or Y/2. hour end. od :all look fittings. riser on r, <br /> sop .. s d pipe .,hn(n,tcns, b on <br /> FOR DETAIL 4F TANS SLAB 1Ciiowad In,talF filter fabric, lie-down 'S6gs'. and bedding as Specified el ewhare. Set task Ih hole Completion.'of the test, release the air ressure Frain e Secondary k <br /> P <br /> a > m6 y SEE SHEET F-7.1 - - P ; _p. . • th Se, on , y tan pr or to rereosm9 <br /> _u "porb.ly fill with .wates.unit it snks brmly. bn..the bed: Use only enough water to oiillosC icor pal(! pressure from the primary lank Domag¢,to, the primary tank may if the Pressure Tf not <br /> reilevs from the secondor' y <br /> 71i : . bock,11 is to top'pf tank After backhll to top of lank fill lank wit{ water unto templet an 'of Q y Conk foci, : <br /> -PEA GRAVEL ' installation. CautloR Relieve.:all tank pressure Pnpr to remomng any, fittings _ <br /> 3ACKFILL CAUTION � BALLAST LEVEL MUST NEVER EXCEED WATER ON BACKF:LL LEVEL IN THE -hOLE POST-INSTALLAdON .PRESSURE TEST HYDROSTATIC: No tank that she«s any 01idim of 9 leak <br /> -_•� .,, _,..r .+,r ...,.,-, -"' DURING INSTALLATION Oo not.re'ngve ballast until tank "slob has been oured, Do not set rerno'e is to kept m the System, An ` <br /> '-n--T : + -^+-^ r .=T �„ -°""'" '- '^ "'" -'^•"" - - P , ys Any ipcurned to the during: the InStollaticn will be cantrgctar s <br /> action',to be toll wed P ' 4 y Cage and will determine the course of <br /> T4. 1,6. . p UBLE WALLCFRP�IT�4K NSTALLATf s seen removed from tarx responsibilityobThe Chevron Re is. to 6e notified of on tan <br /> (L„ 4 ON 1f sthydrostatic test is required by a local agency, the contractor I$ to Isolate the lent; for testing,and <br /> A MATER 1 reconnect when testing is complete They hydrostat . test will be abtotned by Chevron. <br /> o ,0 1. Qoubin-wo i fiberglass reinRoiced o•astle' (FEE) storage tanks as .>up pIfed h Ckev,. are to be i INTERNAL MEASUREMENTS' Take inlerm l diameter mv'ssur¢mep[s at (he fill end the remota pump <br /> a w:1h (he P Y 7 . u " <br /> installed by Can Uacfor In acct d5n_o p!pns and specrflCotions as supplieQ by Openings, on doth Single and double wail FRI • .tanks The Cogiroc tor, witness Is the Chevron <br /> manufacturer: Rox, is responsible'for makipg and recordng.on a form provided by the Compgry„ the required <br /> _______ hatnlnpl Iril9r-y j ,yg`g_'Ngu (�7gq¢Q yi( measurements Take the Frst set of megsuremen is Prior 'toplacingany.lcoubt around the took The <br /> - % rxd FL of rid n second,Set of measyremegfs is to be taken when the bockfiil has reached su{lgrade'(prior to pUvr ng <br /> '- . _s _�p.Se�.-_g t to conareta slab) '. .. .` .. , <br /> A 12,000 37' 0 !/j`i Long 35 -3" Long If the difference between b o sets of readings is greater ikon I t/4" stop the Job, The C,hgvran, Rely <br /> Is to be nolfed and will determine the course of notion• .Contact the tank, manufacturer for further <br /> n v IJ� 4' ALUMINUM FILL TUBE W POS1T1 SHUT OFF 42 30' g' Lon , guidance <br /> �� �� , 4-0 0 D, A" 1 1 2' O D. <br /> p r f9 _ / s iQ,090 st' rr i/2` Long - _y K. 8ALLASTING Only the primary (inner) tank shall be used when ballg$ling ,fha took {Dever f the <br /> ( i _ S-0 OD 8' 1 9 2'.QO seconder (outer) with' ( <br /> MONITOR PROBE TU LOW 8Y. / y' ( ler tank te ) it t If the tanks ore baltosted, 44rduat Hydrostatic test nstaad of <br /> END )F TANK, 1,0100 11'-7 1/8".,Lonq le-6 1/8x'Long thg'pdst-sslgllabon air lest) oil the tank and httkJgs <br /> o s' f [ I � ' ' 4, „ T r,L L ^ BURIAL DEPTH; The burial dePtn from the tax pf the tank (a ground level sholl be a minimum of 3 <br /> OVER 4•E R!BS 5 7/3. 01 4--3 1/4 OD feet and a maximum of 7 feet"The fittings, .if a monwo <br /> N i i (NOnF O D c , . .approximately <br /> ` ( .,off the to Of.the, tank. This shalt be cons+der d for the slope c the i a to f nates <br /> ' " y I$ used, Will be <br /> 1 1 <br /> II <br /> LOPE'TANK Fi it,' I ' y,, Imd z p nc ' d r, ( _ specified) l 1 ,. e - P f e pPing and thus' may affect the <br /> •s: i 7 .0th r Contras Kg pp _qui meat lude� par .recovery when s ep tied Phase I <br /> DOWN TOWARDS FILL ENO lank bursal depth,t <br /> Il . ., - I I IA<,ernplles. Adopters, gust tops and r,wnep ate holders: Phaco 11 Fqu pmenf, An[i-Rearcvlalwn tz. VENTIN n I - <br /> -- -' valve, ni` h hose retractor, nozzle ,swivels ties limiter, n i- G: Vet ,fie onnu ar space-between the pumafp gnd 'sacondory took only I( required by Ipcal - <br /> I1 exfensit, a t kink springs sw vel slops, tortes,, rprisdict ons Venling,of the annular spoce. is not required by the tank manufacturer. if required. 2' . <br /> Inch FRP pipe Shelf be manifoldbelw,e¢n the barks and Connected to one went rifer Oo not use the <br /> I.1 <br /> 1.13 Hf NDLiNG OF YRP TANKS Printery (HradUpt) to" vent to vent the dnnulgr space ' <br /> NTERST117AL MONITOR( A pull string may b@:In' the tank, inatelf a ret uif string if the string s <br /> A .RFSPONF1911 h Coors tar is les on .b; ` r ff--Icod it + -lie bla ,. P 3 <br /> y g ooble nen isle, missing, lost. or BrOof t b atom sen rip nsl'o tank mgiiuf. Inser . fish to demo Instoil the <br /> ' fl . e. on 4 p S n o o u<d n a tanks. dram thpl cel . . g .. Y <br /> -�- A Grano or b.imte o5000 ', 6 0 po capacity must Ge used the weight of kh,e double wall FRO ;niers Sa' mgnlloi ' C 1159 boll0al.ce di T •: <br /> _ g - .e nt@ oe O the FRP tank. Insert fish tope thrial g the aAttac <br /> land: Is. aPPFoximatel 5000 .,6000 aunts. p g `,pull sem to the plebe 'sI nal. cable•pE. 1 . ' ft. lu h burial <br /> -� Y moving <br /> P,_ Stage. <br /> bath the Q g„ 2 ¢ P s the bu a depth Attach the <br /> �{� '_- - r3. LIFTING & M041NG: When piling 01 mamng,an FRP IOnk, always use properly sized, e uip,nent and pill trio to the robe and to h fish Edo n : - ' <br /> �! , 9 p. S •.q P ., . the p a d Pull.probe into tank, When the ldg4'on oho..s.yna, <br /> Tr c._�...� `-�.� _..._,._ _-._-,_ Chi li.t..b Intag n forge <br /> aEE. DET. A BELOvd - y. y.least <br /> peas) 0 ,tig 9.s everter lhnn s diameter use spreader btu to ensured !an cn I¢ poll end. fhe. 'ul.shin -cath the o 'i he ' <br /> - - -,fI_ ,-- T r - . 9 e . P e f u F F be s rt the pollom sen teNvie of the took. The Pull string is <br /> 1- Ef. - �{' 71;, of A619ast M15 .afL each lifting lug. Never Coll w use Cables or chains around an FRP ten fie on ' .la remained l - r r g <br /> �. "` <br /> SEE UFuT,_B n_LOW- ----- - , k t PaaO T future SLUE: ib Lly.:.: <br /> $TEFL. PLATES UNDER (EACH GPENING � 'srnbofh. rcdnd,-.Tree OP rocks an foreio b Cts. ' r � '-� <br /> g _ .d g96' le ' 0 iNSTALig THE tigress ENT SUMP The containment sump muss be watertight 10 prevent <br /> 8Y TANK MANUFACTURER , - v 9 ; <br /> MIN. 9 S 3/4 '2'_Q' EXCEPTION - Tank eon be relict up.to 90 on a smooth ?lean surface wren Performing the pre- •lata ingress or egress Fiber Igss inside and o he sum t <br /> 4 g .. de f t p o the tank cellae <br /> _... ...,__ _-_:- ,. . .._ __: _ .._. ___. inatopal pressure test • <br /> ' MIN. WRFY N/' TANK L1F(i r MIN C, 'CHOCKING'.. ;Tanks ore to b hock h n + ' <br /> a chocked di it exintn cp with expected, <br /> anchor <br /> recommendation uPtd F INSTALLING rnE SPILL CONTAINMENT FIfor 0X, The spit containment here should <br /> be liquid c h hl. " <br /> ready,Tor imp aps If wady conditions exist or era 9xpec( aI equate (inks using minimum I/2" Test all?ever <br /> dao es by is to with taker for o titer Into of one hop,. There Sha Id be ridr,. g ; fh <br /> the lot herds reps a+¢r. edch' timk cnd seCbre to sicker' OI ode pale. size to water leve( aurin'. this .lest. Da not drain water Into IN inn u a P r o, ' <br /> _ q Prevent noveaient of y t e t.. <br /> the tones < .. <br /> p� <br /> p p pp y l3 OPD.NlsG5 Ail' tanks ore shipped will, dost covers or steel plugs n each opening Cvst canons ore to ' IA APPROVED MATERIALS <br /> 10J DIA, 4000 GAL. FILE! GLASS 'TANK AND EXCAVATION SECTION D ' remain m each, Opening until ready for the pre inSo101 oo ProSsure test, All tanks must have either a A APPROVED 8ACKFiLL MATERIAll ' <br /> �! o dust Cap or steel ploys n Pier.¢ Or a 5 psi pressure relief vane in place of all time$ 1 PEA,GRAVEL''`'A, clean, naturally founded ;g9tegotr with p 1/6" minimum and a 3/4' mgximum <br /> di,zorl..Up to 3% Of the Particles, may Pass through a t,8. sieve, <br /> E DAMnspect ail look, corefiipy for sans of d"o ge upon receipt Note any damage an-the $r n� .. STONE R R <br /> g ,., . PPI09 ? . P.. , 0.. G AVEI. CRUShING$: .Washed maFenal with p. partite size between 1/8e and 3/2' p. <br /> a FOR OETAIL OF TALK SLAB 'documents and notify the Chevron Rep. Contoct the' look maAGfoclurer for add,tsnai to VS of the,partk(e8 may pass through'a t,0 au,e <br /> SEE SHEET F'--7.i - in farmo(lort. ice and snow, and meet ASTM C-33, P9ra to' h 71 <br /> a N07E',. ApProve4 ma(erigl§ most as cry, free of <br /> P. if the leek Is damaged at any other hone,'. do diet nttempl repairs. Notify Chevron Rep, xh) will for quality said soundnestl. The dry gavot density rust bo 0 minimcm of g5 our s -Per space foot, <br /> determine the course of.act. n p - <br /> PEA GRAVE{ a Sl , :'. B (ANN H,QLE I,1NEP:' Contractor fa to Pfovlded d alter Fobde Yank Hole Liner when <br /> ' BACKFILL f°Eti1NG el .tanks on prepared bed with s slope downward toward the fill end of the tank A slips 1 Took hole 1s unstoble sal of <br /> .,_____ of 3 cif erence between the litre extreme 'openings of the tank Is. desired. The acceptable, range of 2.. S ih Chevron 'r . + - r n <br /> -- '• -+'--+- - -+ -.. -..^ ^^ -^ -^- -+ -- -, --. -r-- -.-- -+ -.:' -. --+'"--, -r""""""""` .- I ' r F g . Petr ed.by C! e on Rep,,The entire tank bold (,.dao and bothom) _ha., be covered Lay the <br /> -. __.- „-„ �+ +,1,, ,,�, �,,, v ---w T� s one._ s 4 maximum Land 2. -miPimum, with the fol end (ower than rourate pump end a( the fork. fopr,O` w th 2 foot minimum Overlaps.' ` - <br /> .--..-.... it Tanks that exceed the oaceptoNe $tape o/,,hot slope dawnwurd to lh¢ remot® pump. end are NOTE 6edUin moterial; lie-down ']o $' and sone le wells are Fa be Ice n h 1 f <br /> 9 ,. . g, P. e pieced o the op of the Iter fabric <br /> improperly set and most be'reset. . .�„ Excess rubric at top of the hole. should be folded over the-backfill mptericl at subgrade tovel <br /> G INsTALLAT 0�V WITH APPRO`.'ED. MATERIALS. <br /> t'J" - r t4,Pidce a 12' lift Of b ckbll, event ground the tanks rush backrk sem Io underneolh Its to C APPROVED FILTER FABRIC 3I4 1 OrETypo <br /> r i ; a Y p bo k - Reemoy Inc -' Typo, 3401 nr, Typar 3,541 <br /> o� between will <br /> rbe and under Itie endo caps.,Procedure pan Ga done from hank ar' odiacenl tank; ..lop Prbil:ps.Fbers Corp_ -' Supac 4Np' loans <br /> mss• - ., ' .Tf a man wll,0@ m the hole to worn the.bockfll, Fall must be shared or side sloped us Hoechst Coroners Corp - Travis S1120 , ' <br /> Prsscrbed by content OSHA regulations, , . or (obrir. apP•ovedby the tank men dna Curer - - <br /> ?: Place second IV lift Or backfill every around the tanks, Agen, repeat the "working' or bockfiil <br /> -- - --S�"-":'r•p,,l between the ribs and under the end Cop$. Add hockfili evenly around the Looks up to the lops <br /> \of the tanks <br /> LL ` 3 Bockfill to t le rade after <br /> _ „u g pilling and testing s completed, <br /> SL NSTALLATION N47H ALTERNATE 4AATERIA45' AI( alternate <br /> moleriols must be Gom pc,,cfed to 40� <br /> C5 � � rWdtive d¢M1siEy (ASTM 0- 1537-70) Crontrgctor is to (�irnlsh Chevron Rep will) rerGfi¢auan of <br /> a / _ p _ I I \ cornpgation from m registered Tsai ens Heel Chevron dee. is responsogfor providing. the exact <br /> rY. i -T-�- MONITOR PROBE <br /> TO LOW 87 ins",anal Ion specification for dternote mgtenal9 <br /> o ; END OF 'TANK. I I 1 t TANK TE3TING <br /> v. I I SLOPE TANK t' N 10' - I i A PRE-INSTALLATION TEST SET UP! P or to the ra installation test, all sh' m ds <br /> DOWN TOWARDS FILL END _ i I roshoyed from the tank andthevacuum ory t m s m„f be <br /> . D red /b add , X. III Y�uPPIieA (oirn5, . .._. PP 9 pods <br /> tesfs <br /> !' <br /> to <br /> NOTIFICATION . <br /> I r Tri rRep., <br /> .' Chevron U.S.A Inc (.Chevron ) Owns the copyright rights to the design of the heron de5crlijed fueling <br /> -. I 9. ..n¢vroR ftep ,_MUST Oogerve al Egi5, Nobly ct 1¢ast 24 nems 'n.cAvarce of any testa System as embodied in.any ton ible.or efecirorb medium of yx res$on incl ' i0 oil building <br /> �' <br /> l� C. P.he pi- RE APPLICATION SYSTEM: J ' designs, archdeeturoi plant and drawn s The copyrighted rnaternol ncludes tie overall form as tell as <br /> \ A - 1 ,: The Pr¢urule g PIICatian. system Is to have L",, pressure.gauges (range 0 to 10 Psi wi Ui tS $I the'arran men ata of ' <br /> TI > _✓ -res yr rollers <br /> ` , ' v P arrangement SPmpgsd on, o . space} and in the design, but does not indtide ndlvtduol <br /> _ .y,..,,.�r.,�:v� ” ' = I,. sure .,19 aj in system, ball in good condition and having been tested `ant co ib,oted within standard. features Anyone, who wishes to copy, di:dnbuto or,sell this, drowni or any derivative warps <br /> a three month period prior to the tank test (copy ofthelest and ;oiibration doto to be lumished to based hereon most hove the poor written Consent of Chevron; except for copies mode to, the sole <br /> trr the;Chevron Rep.- upon reap est}. .purpose of preparing construction draeings for Chevron branded TON hes and all such copies stoop be <br /> T� USE EXTREME CARE AROUND AND NEAR THE PRESSURIZED YANK, RtiP,o the ressure r,r to returned to Chevron i on: request <br /> o ¢ Z- = SEE DET A BELOW - - ' ill �5 C: ' p p P - - <br /> •1 _ ,��� L i) Ic-` m4ytng the tank Ot remoyrig mt f ttings <br /> _ 2"d SEE OET. B is OVy:-.,_ - I- y <br /> Never. pra5suhze <br /> the secondary (a pled) tank',, shout pressurizing the prir,ary (inner) tank 'r;f - U199B Chevrut U$A loo—At rghl`Ceoerved <br /> 2-0 : 1} , 'd7 �3/4 2_Q D LEAKING TANKS :r• : The drowinys, cdcuhabOnt, and any clouts r¢fer@ace to eau meat materials or components, <br /> MIN .VERIFY W/ TANK MFG- T- - -MI- '<00 1") mstad_a:took which Shows any evidence of a. Rear, The Chevron Rep S tro be not fed of m It included herein, erg.. eherki, and not des red for site specific o Ifcobon Chevron does ' w rn <br /> y 3 .. g P. FP s fJ on o s not 4 ono , <br /> damage and will it .the course of action to be, folloned or guaranty the oc,uracy,'comPletene$tk mercliantobiity, intended' use 'v r,gptrp9bdily of such drawing>, <br /> E SCOPE OF *)RK <br /> needs of yc" r Si atelocal real equipment, materials a lbSect r Pr e the requirements or <br /> The Contractor isle=pcnslble for all abet, material and equipment necessary la Conduct the needs of u, Site a ioc�f - <br /> r - follpwin tests: Yc s ? area, Consult a reNistTred aroh tact Or Professional engineer to determine <br /> 10 DIA. 20,000 GAL. FIBERGLASS TANK AND EXCAVATION SECTION s g any site specific desfg8; applicability, accessblity buQ,ing code, munTopal requirements and any and <br /> Pre Ins ailation Pressure Test, Air of applicable fedorol, state and local statutes, ruNs and .eel bn9 which may affect your site <br /> ! 4+=1•-Q' - Af{ r nelaialon Pressure Test„ AR or HydeAslala Chekran does rot provide there sefv;"s • i <br /> --PUMP GENERAL NOTES fi x T TAWS <br /> uBT. �r -- -- -- - <br /> ---FILL TUBE .. - <br /> on <br /> ? SET TANK DEPTH Tp ALLOW PRODUCT', VAPOR, AND VENT LINES g•-1 8, <br /> T0, rl OPE 1/4 PER ROOT MN. COWN T6 TANK. ^-^-^^ _, <br /> Marketing 4600 WATFRLb_O ROAD - <br /> MAX. t iJ ^ 2. CONTRACTOR SHALL VERIFY THAT THFTURB NE HEAD WILL 9E 4- TO 6' - _ - <br /> "> IF IT I THE TANK BOTTOM. GB NOT INSTALL. fU RBINF. PUMP ASSEMBLY 4..am STOCKTON, CA, <br /> IF IT IS LESS THAN 4" FROM O NOT <br /> 61 TALK _ <br /> 3. REMOVE SHIPPING ('ACS FROM TANKS PRIOR TO INSTALLATION Heytiona aiom 4 �� <br /> ___ _ . _. -.� _ _ -_ Ek:ALE AS &iO4YN DATE:2eAPRr7 <br /> TOP OF FIBERGLASS OVERLAY <br /> ,,EEL PLATE ' . , e !-L APP; <br /> STEEL PLATE -- ,-•p.�s....�....._»-,....,.._._..,�... ...«,.........i. <br /> DET A DET,B " <br /> -- <br />