My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO 1987-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 4:19:13 PM
Creation date
11/7/2018 9:20:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1996
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\COMPLIANCE INFO 1987-1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7i <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING-?ROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name Crn I es Ce ,e -Q S�- <br /> Facility Address (49o -+ L , 12.,L <br /> A. Describe the frequency of performing the monitoring: <br /> Tank et"Al" I 4 ds v <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank sIQ <br /> Pipin M. _._A <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> _ �ec'� �n,vNrtiNi.v <br /> E. Reporting format for/monitoring: <br /> Tank <br /> Piping_T <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance 1with the manufacturers' maintenance schedule <br /> but not less than <br /> revery 12months: Gµerk 9� -fo de_ s?S <br /> (p, <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: SNS{, �1 (T�n9m, � Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.