My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO 1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:04 PM
Creation date
11/7/2018 9:21:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\COMPLIANCE INFO 1999-2005.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />4. SPILLlOVERFILL CONTAINMENT BOXES <br />Page of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes C <br />Spin/Overfill Containment Boxes are Present, but wets Not Tested 0 <br />Test Method Developed By: 0 Spill Bucket Manu factmer ndustry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum 14ydrostatic <br />0 Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />�'+ _ <br />_ T..-, �7 Fo• � ^1; �"' . yt�M . i' YF'_ <br />t:�`� "4v-K'I n`�r%��^#3i?1 �Mw::;i:�s :'.`, <br />Spill Boa # C( <br />Q ! Spill Boa #(JoSpill <br />Box #,r, <br />Spill Boa #,raq� <br />Bucket Diameter <br />12-l' <br />i 2�' <br />Bucket Depth. <br />' t <br />Wait time between applying <br />pressure; vacuumAvater and <br />starting test: <br />`t • <br />raj ., ; <br />lei rt <br />i e) n K <br />Teat Start Time: <br />Initial Reading (RI): <br />3 Z <br />�L� <br />Y <br />Test End Time: <br />/ Z k0 <br />/ 2 `(a <br />/ 2 qc <br />Final Reading (RF)-.%� <br />Lj %2 . <br />%Z <br />e13/Y <br />Test Duration: <br />11A.' <br />L>r l <br />i i` <br />l 14 P - <br />Change in Reading (RF-Rq): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />0 Fait <br />an 0 Fad0 <br />Y+'aiiss <br />L Fail <br />Comments — (include information on repairs made prior to testrrrg, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.