Laserfiche WebLink
SWRCB, i <br />Page <br />4 SPILL/OVERFILL CONT <br />AINMENT Bvnrr;b - i <br />Facility is Not Equipped With Spill/Overfill Containment Boxes <br />❑ jryt / <br />SPHI/Overfill Containment Boxes are Present, but were Not Tested ❑' Y `7 <br />�ra 1re <br />Test Method Developed By <br />4—j4 <br />❑Spill Bucket Mamrfachuer n C6a �c %C a rt <br />Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum ydrostatic <br />_ <br />- — ❑Other (Specify) <br />Test Equipment Used: <br />-- -- <br />Equipment Resolution: <br />Sell Box # <br />P f <br />� t Spill Rox # Z <br />I�. C- Spill Box # � Spill Box # <br />Bucket Diameter. <br />12 , � <br />/ L `1 <br />Bucket Depth: <br />.7 ` e <br />/Y <br />Wait titue between applying <br />pressurel acuumhyater and <br />( 6 k"I c zk <br />/d 0.7 <br />16 ,y 1 p <br />staginM- test: <br />Test Start Time: <br />/66 <br />Initial Reading (Rj:---- <br />Test End Time: <br />Z200 <br />/ 2 0 0 <br />2 6d <br />Final Reading (RF): <br />le, <br />Zc� <br />r, . <br />'' <br />Test Duration: <br />r <br />lit r <br />Change in Reading (P, -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Fr Pass Fail <br />Pass ❑Fail <br />Pass 0 i <br />❑Pass ❑Fail <br />- pncluae mjormauon on repairs made prior to <br />