My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO 1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:04 PM
Creation date
11/7/2018 9:21:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\COMPLIANCE INFO 1999-2005.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 2 <br />VI DISPENSER MONITORING `150 <br />MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHODS) (Check all that apply) <br />❑ 1. CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT (UaDC) Ms2. <br />MODEL #: <br />PANEL MANUFACTURER: Mss. Msi. <br />MODEL #(S): <br />LEAK SENSOR MANUFACTURER: ❑ a. YES ❑ b. NO nus. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a. YES ❑ b. NO M56, <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? <br />a. YES [3b. NO Ms7. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ <br />2. MECHANICAL. ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR MODEL #(S): VALVE IN CASE OF LEAK Mss. <br />ASSEMBLY MANUFACTURER: Mho. <br />3.VISUAL MONITORING DONE: ❑ a. DAILY <br />�, b. WEEKLY(Req-w-m-e a --D <br />hrbl. <br />❑ 4. NO DISPENSERS <br />❑ 99. OTHER (Specify) -.. <br />VIL ENHANCED LEAK DETECTION MrO. <br />❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING Mea. <br />REFERENCE DOCUMIIN tJ mruw r ......... ... --------I <br />I. THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />G EQUIPMENT (Required) <br />2. OPERATING MANUALS FOR ELECTRONIC MONITORIN <br />3, ❑ THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of 7/1/2004) <br />4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6, ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS -MANUAL AN <br />STATISTICAL INVENTORY RECONCILIATION"Msl <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. ❑ OTHER (Specify): <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to r exann administered <br />dmi is duties and can access those documents when needed. <br />. <br />- who has <br />By July 1, 2004nd this wally therewill have after, the a`"Deesignated UST ignated UST Operators will train passed <br />I'ry employes in the proper toperat on1 and maintenance of the LIST onal Code Council lsystems. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the leak detection equipment. <br />➢ The facility employee's role with regard to spills and overfills. <br />D Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or atter July 1, 2004, the initial training will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDITIONAL INFORMATION <br />uired by your local agency): Me5 <br />use this section to include any <br />X. PERSONNEL'RESPONSIBILITIES <br />PLICATION <br />ON <br />:'q OLITY FORM WILL HAVENULTN�ATE AAUTHOTRITY OR PERFORMING THE MONITORING A 3 ER IT API <br />UCTIVITIES UM iv.,AND MAINTAINING ENI US[ MLEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />..,._�.,..T,-..� 11..rrnonAmr'p WITH 23 CCR §2715b). _� .. <br />the <br />I <br />and accurate to the best of <br />Operator <br />OWNERIOPERATOR NAME (print) V <br />(Agency Use Only) This plan has been reviewed and: ❑ Approved <br />Local Agency Signature: <br />Comments/Special Conditions: <br />SJCEHD-d (07/03) - 3/4 <br />mwq-11 <br />V// — <br />Ms2. O W N ER/OPERATOR TITLE: <br />❑ Approved With Conditions ❑ Disapproved <br />Date: <br />07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.