Laserfiche WebLink
I l/ Three complete sets Ons (include manufacturer's specificatio ets for proposed equipment to be install: <br /> 2. '�j Plans drawn to scale in non-erasable print. <br /> 3. ✓%, Plot plan to show location of tanks and all associated piping. <br /> 4. �/ Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-sectional diagram. <br /> 6. 11V// Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. (Title 23, Chapter <br /> rticle 3, Section 2631 (b) 8 26351 <br /> 8. ✓ Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (1') and <br /> jsecondary (20) containnent systems before covering. [Section 2635 (a) (3) 8 (4)] <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results t, <br /> submitted directly to PHS-EHD from the testing company or owner of facility. (Health 8 Safety Code, Division <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK # # 1 # a # 2> # # <br /> CAPACITY -S >Ojcll <br /> G 1uD UiP LIu ID <br /> MANUFACTURER n w[ Z �("Cn nlLa✓vn 7 ti <br /> COMPOSITION '4' 7m <br /> Cd tii 1r 03s Y'U'!5�'S r�✓,V <br /> MODEL T II J (!i' <br /> PRODUCT ` - �e� 1'.� If{,q GJ) <br /> POO 4Qct'ktl <br /> CORROSION PROTECTION <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> a. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installati. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank [Section 2635 (a) (2) (AA <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, wash. <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />