My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 1:51:11 PM
Creation date
11/7/2018 9:23:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\INSTALL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I l/ Three complete sets Ons (include manufacturer's specificatio ets for proposed equipment to be install: <br /> 2. '�j Plans drawn to scale in non-erasable print. <br /> 3. ✓%, Plot plan to show location of tanks and all associated piping. <br /> 4. �/ Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-sectional diagram. <br /> 6. 11V// Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. (Title 23, Chapter <br /> rticle 3, Section 2631 (b) 8 26351 <br /> 8. ✓ Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (1') and <br /> jsecondary (20) containnent systems before covering. [Section 2635 (a) (3) 8 (4)] <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results t, <br /> submitted directly to PHS-EHD from the testing company or owner of facility. (Health 8 Safety Code, Division <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK # # 1 # a # 2> # # <br /> CAPACITY -S >Ojcll <br /> G 1uD UiP LIu ID <br /> MANUFACTURER n w[ Z �("Cn nlLa✓vn 7 ti <br /> COMPOSITION '4' 7m <br /> Cd tii 1r 03s Y'U'!5�'S r�✓,V <br /> MODEL T II J (!i' <br /> PRODUCT ` - �e� 1'.� If{,q GJ) <br /> POO 4Qct'ktl <br /> CORROSION PROTECTION <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> a. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installati. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank [Section 2635 (a) (2) (AA <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, wash. <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.