Laserfiche WebLink
EW UST INSTALLATION INSPECTION RECORD <br /> FACILITY NAME: ,.` - ADDRESS <br /> TANK# UL# / TANK MODEL/MATERIAL: -; > f-- <br /> FACILITY ID# ''� ` <br /> CAPACITY: :- i .-� -. �5., ^C, PRODUCT: r �r r D/. ';� _� �'`.� <br /> R.E.H.S: <br /> �'t <br /> A <br /> P N ALL TANKS TO 8E INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> 0 S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br /> 2. UST INSTALLATION PLANS APPROVED <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: <br /> HOLIDAY: <br /> VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: <br /> PSI: HRS/MIN: <br /> 5- TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL <br /> (API/PEI) <br /> PIPING INSPECTIONS <br /> 6, PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) <br /> (CCR 2636 (e)) <br /> 7, SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (LCR 2636 (e)) <br /> 8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) <br /> HRS: (CCR 2635 (a) (4)) <br /> 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br /> PEI <br /> (CCR 2635 (b) (1) (C)) <br /> 10. OVERSPILL PERFORMANCE TEST <br /> 11. ALL PIPING AND FITTINGS CORROSION PROTECTED <br /> (CCR 2636 (b)) <br /> 12. PIPING SLOPES TO COLLECTION SUMP <br /> (CCR 2636 (c)(1)) <br /> FINAL INSPECTION <br /> 13. PERFORMANCE TEST FOR "ALL" MONITORING PROBES <br /> (CCR 2632 (c) (2)) <br /> 14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br /> (CCR 2632 (c) (2)) <br /> 15. PERFORMANCE TEST OF LINE LEAK DETECTION <br /> (CCR 2643 (c) (1)) <br /> 16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SNUT-OFF <br /> (CCR 2636 (g)) <br /> 17. BALL FLOAT VALVES INSTALLED <br /> (CCR 2635 (b) (2)) <br /> 18. OVERFILL PROTECTION INSTALLED/APPROVED <br /> 19, TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br /> 20. TANK INTEGRITY TEST (PASSING HARD COPY). (CCR 2635 (a) (5)) <br /> 21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br /> 22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br /> 23, MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br /> 24. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br /> COMMENTS: <br /> EH23-006 7/97 <br /> 10 <br />