Laserfiche WebLink
UST INSTALLATION INSPECTION RECORD •/e I /J / <br /> FACILITY NAME: J S -7 S ON <br /> K,% G)�0-,5 ULf c TANK WMELIMATERIAL: 4i)A/ U <br /> FACILITY ID# TANKS O `J <br /> CAPACITY: <br /> D (,'//�� <br /> D PRODUCT: <br /> A [ <br /> ? N ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> 0 S <br /> ITEM OR E=PMENT INSPECTED <br /> 0A7E <br /> 1, UST PIANS SUBNIT7ED/ FES PAID <br /> (H+S CODE 25787) <br /> INSTALLATION PLANS APPROVED <br /> V INITIAL INSPECTIONS <br /> j, INSPECTION AND TEST OF SECONDARY CONTAINMENT: <br /> HOLIDAY: <br /> VACUUM.if 7 <br /> SOAP: PSI: HRS/MIN: 3RINE(LIDUID ANNULAR): OTHER: <br /> I 14. PRIMARY TANK TEST: <br /> PSI: HRS/MIN: <br /> (APtlPEI) <br /> 15, TANK APPROPRIATELY PLACED ED WITH APPROV3AIXFILL <br /> PIPING INSPECTIONS <br /> 1-d3- <br /> � ,(� PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MiN) <br /> (CCR 2636 (e)) <br /> / -d3 SECONDARY PIPING CONTAINMENT TEST ?SI: HRS/MIM: OTHER: (CCR 2636 (e)) <br /> R I <br /> 0 8 LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) <br /> MRS: (CCR 2635 (a) (4)) <br /> PEI <br /> 9. UNUSED TANK OPENINGS SEALED AND CNR0.SI0/1 PROTECTED <br /> 10, OVERSPILL PERFORMANCE TEST <br /> (CCR 2636 (b)) <br /> IT. ALL PIPING AND FITTINGS CORROSION PROTECTED <br /> (CCR 2636 (W(1)) <br /> PIPING SLOPES TO COLLECTION SUMP <br /> FINAL INSPECTION <br /> =14. <br /> ANCE TEST FOR "ALL" MONITORING ?R08E5 <br /> (CCR 2632 (c) (2)) <br /> ANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) 2632 (c) C2)) <br /> MANCE TEST OF LINE LEAK OETECTION <br /> (CCR 2643 (c) (1)) <br /> MANC'c TESTOFAUTO RTIC PUMP SYSTEM SHUT-OFF CCCR 2636 (9)) <br /> LOAT VALVES INSTALLEDLL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) C J) <br /> 19, TANK ACCESS PORTS 3RCUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br /> I20. TANK INTEGRITY TEST (PASSING HARD COPT) (CCR 2635 (a) (5)) <br /> 121. MONITORING PLAIT, RESPONSE PIAN AND LOG 3OOK ON SITE (CCR 262 Cd)) <br /> (CCR 265 (d)) <br /> 22. "C^ FORM COMPLETED AND SUBMITTED <br /> (CCR 260-2636) <br /> 23MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br /> 124. ALL CC WITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br /> COMMENTS: <br /> E423--306 9/95 <br /> J <br />