My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 1:54:02 PM
Creation date
11/7/2018 9:23:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br />The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br />representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br />contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted within five (5) <br />working days pursuant to California Health & Safety Code, Section 25295. <br />WATER NOT PRESENT IN THE TANK PIT <br />PIPING AND STOCKPILE <br />PIPING SOIL SAMPLES <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION OF SOIL SAMPLES <br />TANKETANKZE <br /># <br />2 Samples every 50 cubic yards <br />of SOIL SAMPLES <br />1 er Tank <br />Fill OR Pum End of Tank <br />From wall next to tank <br />ends at soil/ groundwater <br />A430,000 <br />Center and Ends OR Sides of Tank <br />2 r Tank <br />1 at each End of Tank <br />interface <br />> 10,000 <br />3 or More <br />per Tank <br />Ends and Middle OR generally <br />spaced along the length of the Tank <br />PIPING AND STOCKPILE <br />IIIA r o rc VnVcr%rr rN rr ANII PrT <br />PIPING SOIL SAMPLES <br />1 Sample eve 20 lineal feet <br />LOCATION of SOIL <br />SAMPLES <br />TANK & PIPING STOCKPILE SAMPLES <br />2 Samples every 50 cubic yards <br />IIIA r o rc VnVcr%rr rN rr ANII PrT <br />SLAB PRESENT IN THE TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br />collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br />TANK <br />TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION of SOIL <br />SAMPLES <br />MINIMUM NUMBER of <br />WATER SAMPLES <br />TANK <br /># <br />of SOIL SAMPLES <br />< 10,000 <br />Single Tank <br />2 <br />From wall next to tank <br />ends at soil/ groundwater <br />1 <br />Center and Ends OR Sides of Tank <br />1,000 - 10,000 <br />interface <br />Center and Ends OR Sides of Tank <br />> 10,000 OR <br />Tank Cluster <br />4 <br />From wall next to tank <br />ends at soil/ <br />I <br />> 10,000 <br />5 OR More per Tank <br />Ends and Middle and generally spaced along <br />the length of the Tank <br />groundwater interface <br />SLAB PRESENT IN THE TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br />collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br />TANK <br />TANK SIZE <br />MINIMUM NUMBER <br />LOCATION of SOIL SAMPLES <br /># <br />(Gallons) <br />of SOIL SAMPLES <br />< 1,000 <br />3 r Tank <br />Center and Ends OR Sides of Tank <br />1,000 - 10,000 <br />5 r Tank <br />Center and Ends OR Sides of Tank <br />> 10,000 <br />5 OR More per Tank <br />Ends and Middle and generally spaced along <br />the length of the Tank <br />EH 23 046 (Revised 10/19/98) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.