Laserfiche WebLink
0 <br />f) All mobile equipment must be equipped with seat belts which must be worn by <br />the operator at all times. <br />g) All job site vehicles will be equipped with a service brake, parking brake and <br />emergency brake system. <br />B. In the event of open excavations, which is a hazard to on-site workers, <br />the following policy regarding excavations will be followed: <br />a) Entry into excavations greater than 4 feet deep is prohibited, unless the <br />requirements of T8 CCR 1541 are met. <br />b) Hazards associated with general construction may occur during the course of <br />construction. Personnel should be alert and prevent as well as avoid these <br />hazards. <br />c) When tank removal is part of scope of work, there is a significant potential for <br />hazards from falling loads when lifting and removing tanks. Workers must be <br />especially alert to this hazard. <br />C. During general construction activities, there is also a potential for general <br />(construction type) safety hazards. This plan does not address general safety in <br />detail, If personnel are frequently reminded and will cooperate in being <br />courteous, careful, alert, and thoughtful of outlines safety procedures, and if <br />they use common sense in actions and in considering probable consequences, <br />much will already have been accomplished to insure a safe working environment. <br />4 <br />