Laserfiche WebLink
• <br />SWRCB, January 2002 0 C T 1 O Mft_ of <br />5. SECONDARY PTPR TF.STTNC U <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ENV1 p�ryg nMALTH <br />❑ Other (Specie) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Piping Run #1 Piping Run #2 <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run # 3 Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 350' <br />Approx. 350' <br />Approx. 300' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at STP <br />Piping Sump #1 <br />Test boot at STP <br />Piping Sump #2 <br />Test boot at STP <br />Piping Sump #3 <br />Wait time between applying <br />ressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />9:40 <br />11:45 <br />11:55 <br />Initial Reading (R,): <br />3 Psi <br />3 Psi <br />3 Psi <br />Test End Time: <br />10:40 <br />12:45 <br />12:55 <br />Final Reading (Rr): <br />3 Psi <br />3 Psi <br />3 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 Psi <br />0 Psi j <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Replaced Old Blue Line Test boots on Super and Diesel Secondary Pipe at Piping Sumps with new <br />Icon 3.5 x 2.40SA Split Repair Boots. <br />