My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO 2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 4:34:37 PM
Creation date
11/7/2018 9:23:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\COMPLIANCE INFO 2011-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 17 12 04:24p <br />AFFORDATEST <br />• <br />209-744-0116 <br />q0 <br />p.3 <br />SWRCB, January 2002 Page _ of — <br />1 <br />7.UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: D UDC Manufacturer D Industry Standard X Professional Engineer <br />C Other (Specify) <br />Test Method Used: D Pressure C Vacuum X Hydrostatic <br />D Other (Specify) 5vo Test Equipment Used: CaldwellLevel Change IndicatorEquipment Resolution:.002 <br />UDC g i&8 -CL 10 -CL UDC 4 UDC <br />UDC Manufacturer: Biuvo UDC MateriaL• Coated Steel eelUDC De the 9,•Height from UDC Bottom to Top See Comments ments <br />of Hi est Piping Penetration: <br />Height from UDC Bottom to See Comments See Comments <br />Lowest Electrical Penetration: <br />Condition of UDC prior to Dry Dry <br />testing: <br />Portion of UDC Tested` <br />water Level J �ra��• �• � <br />Does turbine shut down when <br />safe shutdown? <br />UDC sensor detects liquid (broth <br />Yes XNo CNA Yes XNo CNA <br />product and water <br />D Yes XNo CNA <br />Turbine shutdown response time <br />NIA N/A <br />Is system programmeu wr 14•1- <br />X Yes DNo DNA <br />XYes -No JNA <br />safe shutdown? <br />Test Durat on: <br />30 Minutes <br />was fail-safe verified to be <br />D Yes XNo CNA <br />D Yes XNo DNA <br />operation aI? <br />0 <br />Wait time between applying <br />5 Minutes <br />5 Minutes <br />water and starting test <br />Test Result: <br />X Pass D Fail <br />Test Start Time: <br />10:15 <br />10:20 <br />Final Reading (RF): <br />.001 <br />.uu t <br />Test Durat on: <br />30 Minutes <br />30 Minutes <br />Change in Readin (RF -R): <br />0 <br />0 <br />PassiFail Threshold or Unteris: <br />.005130 Minutes <br />.005/30 Minutes <br />Fail Pass D Fail <br />Test Result: <br />X Pass D Fail <br />X Pass D Fail <br />Pass D <br />Yes ONO UNA Yes GNo ONA <br />Was sensor removedfortesting? <br />XYes CNo DNA <br />XYes DNo ON <br />Wassensorproperlyreplacedand <br />XYes No DNA <br />XYes CNo ON <br />Yes DNo DNA Yes ONO CNA <br />verified frtnaional aftzr testin 7 <br />(include information on repairs made prior <br />to testing and remmmendedfoliow-up <br />forfailed tests) <br />_Comments <br />from bottom of Bravo System UDC s. <br />All Penetrations enter <br />ClrCard Lock Island <br />I If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions ind: Gated with an <br />asterisk (") is "NO" or "NA", the entire UDC must be tested. (See S W RCB LO -160) <br />-,,6,k 1-1-7-I2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.