Laserfiche WebLink
• <br />Monitoring System Certification <br />0 <br />RECEIVED <br />FEB 17 2016 <br />UST Monitoring Site Plan ENVIRONMENTAL <br />Site Address: ERNIE'S GENERAL STORE 4407 E. WATERLOO ROAD STOCKTON CA 95205 HEA! TH nMAMMENT <br />KEY <br />. . . . . . . . . . . . . . . . . . . . . . . . A = ANNULAR <br />........................ F=FILLS <br />. . . . . . . . . . . . . . . . . . . T = TURBINE <br />. . . . . . . . . . . . . . . . . . P = PROBE _ <br />.................. VAPOR <br />X=SUMP SENSOR <br />...................... <br />. . . . . . . . . . <br />. <br />L=PLLD <br />. . . . . . . . . <br />M = Manway <br />B = Brine Sensor <br />I= Smart Sensor <br />S=STP <br />. . . . . . . . . . . . . . . <br />........... I . . . <br />. . . . . <br />. . . . . . . <br />C = Floats & Chains <br />. . <br />....... ..�.................. <br />. �..... <br />.......... <br />.................................................................. <br />............................................................. I.... <br />.................................................................. <br />.................................................................. <br />DSL. . . . . . . <br />.......................................................... <br />.�.... <br />.................................................................. <br />.................................................................. <br />.......................................... I....................... <br />Date map was drawn: January 2011. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detector). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />