My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 1:46:26 PM
Creation date
11/7/2018 9:23:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: X Pressure El Vacuum Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Piping Run #1 Piping Run #2 <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run # 3 <br />Piping Run #' <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 350' <br />Approx. 350' <br />Approx. 300' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Diesel <br />Method and location of <br />i in -run isolation: <br />Test boot at STP <br />Piping Sump #1 <br />Test boot at STP <br />Piving Sump #2 <br />Test boot at STP <br />Piping Sump #3 <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />10:20 <br />8:50 <br />9:00 <br />Initial Reading (111): <br />3 Psi <br />3 Psi <br />3 Psi <br />Test End Time: <br />11:20 <br />9:50 <br />10:00 <br />Final Reading (RF): <br />3 Psi <br />3 Psi <br />3 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Ri): <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recomme <br />Replaced Old Blue Line Test boot on Regular 87 Secondary Pipe at STP Piping <br />
The URL can be used to link to this page
Your browser does not support the video tag.