MATERIAL AND WORKMANSHIP
<br />I. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL
<br />EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK
<br />COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE
<br />GRADE FOR THE PROCESS INTENDED.
<br />2. THE CONTRACTOR SHALL FURNISH TO THE OII.NER'S AGENT FOR HIS
<br />APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER, AND
<br />OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE
<br />PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND
<br />MECHANICAL AND OTHER EQUIPMENT UA41CH THE CONTRACTOR CONTEMPLATES
<br />INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S AGENT.
<br />3. WHEN REQUIRED BY THESE DOCUMENTS OR WHEN CALLED FOR BY THE
<br />OWNER'S AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR
<br />APPROVAL FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES
<br />WHICH HE CONTEMPLATES INCORPORATING IN THE WORK WHEN 80
<br />DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE
<br />CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID.
<br />4, MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED
<br />WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT
<br />REJECTION.
<br />5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND
<br />REGULATIONS.
<br />6, ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS
<br />AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION
<br />OF THE OWNER'8 ENGINEER
<br />1. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR
<br />LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS
<br />PROJECT, IT 15 EXPECTED THAT THE MOST RESTRICTIVE CONDITIONS)
<br />WOULD APPLY.
<br />GENERAL CONDITIONS
<br />I. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS 05HA TRAINING
<br />COURSE PRIOR TO THE START OF WORK. CERTIFICATION OF THIS MUST BE
<br />PROVIDED TO THE OU.NER'S ENGINEER PRIOR TO THE START OF WORK
<br />2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER'5
<br />TRAINING REQUIREMENTS IN ACCORDANCE WITH 1994 CALIFORNIA UST
<br />REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OWNER
<br />CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKL15T
<br />SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO
<br />OWNER
<br />3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK
<br />MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH 1994
<br />CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO
<br />OWNER CONTRACTOR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST
<br />SUPPLIED TANK MANUFACTURER AND 5HALL FURNISH THE CHECKLIST TO
<br />OWNER.
<br />4. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES:
<br />A. GENERAL ENGINEERING "A"
<br />B. HAZARDOUS MATERIAL SUBSTANCE HANDLING l"HAZ")
<br />5. CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL
<br />HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER
<br />AS "ADDITIONAL INSURED".
<br />A. STATUTORY WF;KMAN'S COMPREHENSIVE LIABILITY
<br />B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE
<br />LIMIT OF NOT LESS THAN H,000,000 PER OCCURRENCE FOR BODILY
<br />INJURY AND PROPERTY DAMAGE.
<br />C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED
<br />VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY
<br />OF NOT LE58 THAN $1000,000 PER OCCURRENCE FOR BODILY INJURY AND
<br />PROPERTY DAMAGE.
<br />6. GENERAL CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND
<br />SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE
<br />SATISFACTORY COMPLETION OF ALL WORK SHOLLN ON, CALLED FOR, OR
<br />REQUIRED BY THE DRAWINGS.
<br />1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM
<br />BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE,
<br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA
<br />CONSTRUCTION SAFETY ORDERS, AND ANY OTHER APPLICABLE STATE, CITY,
<br />OR COUNTY ORDINANCES.
<br />8. NOT USED
<br />S. NOT USED
<br />10. GENERAL CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO
<br />REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR
<br />REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY
<br />EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S
<br />OPERATIONS.
<br />11. ALL EXCAVATIONS 6HALL BE PERFORMED IN COMPLIANCE WITH 05HA AND
<br />STATE REGULATIONS. THE CONTRACTOR IS REFERRED TO THE OSHA
<br />BOOKLET, "EXCAVATING AND TRENCHING OPERATIONS", FOR A SAFE WORK
<br />PRACTICES GUIDE FOR PERFORMING EXCAVATION WORK
<br />12. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH
<br />"AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS BUILT5"
<br />SHALL BE COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY ON
<br />APPROVED JOB COPY.
<br />13. NOT USED
<br />14. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS.
<br />15. GOVERNING CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED
<br />TO, THE STANDARDS OF THE FOLLOWING:
<br />AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
<br />AMERICAN PETROLEUM INSTITUTE (API)
<br />AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
<br />UNIFORM BUILDING CODE (UBC)
<br />NATIONAL ELECTRIC CODE (NEC)
<br />NATIONAL FIRE PROTECTION AGENCY (NFPA)
<br />UNDERWRITER'S LABORATORIES, INC. (UL)
<br />CALIFORNIA CODE OF REGULATIONS (CCR)
<br />LOCAL ORDINANCES
<br />16. SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN FOR THE
<br />DURATION OF THE CONTRACT A SITE HEALTH 4 SAFETY PLAN THAT WILL
<br />EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS,
<br />FOR TANK/LINE REMOVAL AND INSTALLATION, PRIOR WORK START, AND:
<br />A: APPOINT AND EMPLOYEE AS THE SAFETY OFFICER WHO 15 QUALIFIED
<br />AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE
<br />HEALTH AND SAFETY PLAN, SUBMIT THE NAME AND QUALIFICATIONS OF
<br />THE SAFETY OFFICER TO THE OLLNER'S AGENT PRIOR TO COMMENCING WORK
<br />ON THE SITE.
<br />B: THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE
<br />NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES
<br />NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE
<br />WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS
<br />OR HAZARDOUS SU55TANCES BE UNCOVERED.
<br />G. CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH EMPLOYEES
<br />AND SUPPLY THE MEETING MINUTES TO OWNER WHEN REQUESTED.
<br />D: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP
<br />OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE
<br />CONDITION. IF THE CORRECTIVE ACTION 15 INSUFFICIENT IN THE
<br />OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL
<br />CORRECTIVE ACTION CAN BE IMPLEMENTED,
<br />E: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM
<br />CLASS RATING OF 2-A;0-5:C0-B•G WITHIN 50 FEET OF THE OPERATION.
<br />11. UNDERGROUND SERVICE ALERT (U.S.A.) - THE CONTRACTOR SHALL NOTIFY
<br />MEMBERS OF US,.A. 2 FULL WORKING DAYS IN ADVANCE OF PERFORMING
<br />ANY EXCAVATION WORK BY CALLING THE TOLL-FREE ONE -CALL PROGRAM
<br />NUMBER (800) 642-2444.
<br />PETROLEUM WORK SCOPE
<br />1. PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND
<br />SCHEDULE THAT ALLOLL6 THE SITE'S STORE TO REMAIN OPEN TO THE
<br />FULLEST EXTENT POSSIBLE.
<br />2. FENCE OFF WORK AREA WITH &' HIGH CHAIN LINK FENCE. POST "KEEP
<br />OUT" SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH WORK DAY
<br />SECURE FENCING PANELS TOGETHER.
<br />3. FLUSH, CUT, AND REMOVE PRODUCT LINES FROM EXISTING TANKS TO
<br />DISPENSER ISLANDS.
<br />4. REMOVE ALL EXISTING FUEL DISPENSERS, ISLANDS, BARRICADES, FUEL
<br />LINES, ASPHALT AND CONCRETE SURFACES AS REQUIRED, IN
<br />PREPARATION FOR INSTALLATION OF NEW AS SHOWN ON DRAWINGS. ANY
<br />SALVAGEABLE EQUIPMENT TO BE REMOVED FROM SITE AS DIRECTED BY
<br />OWNER REPRESENTATIVE.
<br />5. OWNER WILL CONTRACT WITH AND FURNISH CONSULTANTS TO PERFORM SOIL
<br />AND/OR WATER TESTING UPON PIPING REMOVAL IN ACCORDANCE WITH
<br />PIPING REMOVAL PLAN AND LOCAL REGULATIONS.
<br />6. CONTRACTOR SHALL PLACE EXCAVATED SOIL ON, AND SHALL COVER WITH,
<br />4 MIL. PLASTIC UNTIL SOIL 15 REMOVED, ANY 601L TO BE STOCKPILED ON
<br />SITE FOR SAMPLING PRIOR TO OFF -HAUL BY OTHERS AS DIRECTED BY
<br />OU.NER
<br />1. OWNER SHALL PROVIDE FOR TRANSPORTATION AND DISP06AL OF ALL
<br />EXCAVATED 501L AFTER COMPLETION OF ANY NECE55ARY REMEDIATION,
<br />INCLUDING AERATION.
<br />8. IF REQUIRED FOR ABANDONED EXCAVATIONS, BACKFILL ONCE ALL SAMPLING
<br />AND/OR OVER -EXCAVATION 18 COMPLETED. BACKFILL MUST BE ENGINEERED
<br />FILL COMPACTED TO e5%. THE CONTRACTOR 18 RESPONSIBLE FOR
<br />CERTIFYING THE COMPACTION.
<br />J. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW EQUIPMENT,
<br />10. INSTALL "TYPAR" FILTER FABRIC LINER IN PIPING TRENCHES, PER
<br />DRAWINGS, WHERE REQUIRED BY WET -HOLE CONDITIONS.
<br />11. INSTALL EQUIPMENT AS LISTED IN EQUIPMENT LIST INCLUDING
<br />SALVAGEABLE EQUIPMENT TO BE REINSTALLED, IF ANY, AND PROVIDE AND
<br />INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE
<br />PETROLEUM SYSTEM.
<br />12. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY
<br />CONTAINMENT LINES PER DRAWINGS. CURRENT MANUFACTURER'S
<br />INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE
<br />PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS
<br />SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP 15 COMPLETED.
<br />A: PRODUCT PIPING: 2" PRIMARY PIPING WITH 3" CONTAINMENT
<br />SYSTEM A$ APPROVED BY OU.NER ALL PIPING AND CONTAINMENT SYSTEMS
<br />SHALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT SYSTEM SHALL
<br />BE BY THE SAME MANUFACTURER, WITH THE SAME SERIES ADHESIVES
<br />AND/OR FITTINGS.
<br />B: VENT/VAPOR PIPING: RED THREAD IIA AND RED THREAD 11 WITH
<br />FITTINGS AND 1000 AND 8000 SERIES ADHESIVE, OR AMERON DUALOY
<br />3000L WITH ALCOHOL FITTINGS AND RP48 ADHESIVE. DO NOT MIX
<br />MANUFACTURER'S MATERIALS.
<br />C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN
<br />TRAINED BY MANUFACTURER
<br />D: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE
<br />40, OR EXTRA STRONG. GALVANIZED PIPE 15 NOT ALLOWED. FITTINGS
<br />SHALL BE 300 PSI MALLEABLE IRON.
<br />E, ALL STEEL PIPE BELOW GRADE 15 TO BE DOUBLE WRAPPED WITH 20
<br />MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL
<br />TAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP,
<br />F, ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT
<br />WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL
<br />COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH
<br />PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 100% METHANOL, WHICH
<br />SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET.
<br />G: G.C. SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL
<br />MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS.
<br />M DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER
<br />TANKS SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS SHOWN ON "
<br />DRAWINGS. MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING
<br />15 NOT SHOWN ON SITE PLAN, G.C. SHALL RUN LINES THE M05T DIRECT
<br />ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE.
<br />14, PIPING SYSTEMS SHALL BE TESTED PER CURRENT MANUFACTURER'5
<br />INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE
<br />PRECEDENCE OVER OTHER INSTRUCTIONS.
<br />A: G.G. TO NOTIFY OU.NER'S REPRESENTATIVE TWO WORKING DAYS PRIOR
<br />TO LINE TESTING. OU.NER'S REPRESENTATIVE SHALL WITNE58 ALL LINE
<br />TESTING. MARK TEST PRESSURES ON GAUGE WITH ELECTRICAL TAPE AT
<br />BEGINNING OF TESTS. PRESSURE SHALL HOLD FOR AT LEAST ONE (I)
<br />HOUR AND BE WITNESSED BY OWNER'S REPRESENTATIVE. DO NOT BACKFILL
<br />TRENCHES UNTIL AUTHORIZED BY OWNER'S REPRESENTATIVE.
<br />B: TEST PRESSURES SHALL BE:
<br />2" 50 1051 AND APPLY SOAP SOLUTION.
<br />3" 40 PSI AND APPLY SOAP SOLUTION.
<br />3" - SECONDARY - 5 PSI AND APPLY SOAP SOLUTION.
<br />C. CAUTION: DISCONNECT FLEX CONNECTOR FROM STP AND CAP PRIOR
<br />TO TESTING. APPLY d RELEASE PRE65URE SLOWLY. VENT/VAPOR SYSTEM
<br />SHALL BE TESTED FROM TOP OF VENT, THROUGH MANIFOLD(5), EXTRACTOR
<br />BASE AND RISER, STAGE I CONTAINMENT MANHOLES, STAGE II VAPOR
<br />LINES Tq ISLANDS AND STAGE II FLEX CONNECTORS AT DISPENSER(S).
<br />D. SLOWLY PRESSURIZE PRODUCT LINES AND VENT/VAPOR SYSTEM TO 50
<br />1051. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS AND FITTINGS,
<br />CORRECT ANY LEAKS AND RETEST.
<br />E. SLOWLY RELIEVE PRESSURE FROM VAPORNENT SYSTEM AND REMOVE
<br />PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE
<br />PRESSURE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVING 15
<br />COMPLETE.
<br />F. SECONDARY PIPE MUST BE PROPERLY CUT. INSPECT ALL PRIMARY
<br />PIPE SURFACES. PRE85URIZE SECONDARY PIPE TO 5 PSI AND SOAP ALL
<br />PIPE SURFACE AND FITTINGS. PRESSURE ON THE PIPING SECONDARY
<br />SPACE SHALL BE MAINTAINED UNTIL AFTER THE PAVING IS IN PLACE OVER
<br />TANK FIELD AND PIPING RUNS, AND SHALL BE WITNESSED BY THE OWNER'S
<br />REPRESENTATIVE.
<br />G. AFTER BEING WITNESSED BY OWNER'S REPRESENTATIVE, REMOVE
<br />PRES fzE FROM PRODUCT LINES AND AIR FROM SECONDARY LINES AFTER
<br />FAVI IS IN PLACE
<br />. 8HAtL PERFORM PRECISION TEST ON PRODUCT LINES AFTER PAVING
<br />15 COMPLETE AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISION
<br />LINE TEST SHALL BE IN ACCORDANCE WITH NFPA 329, LOCAL
<br />REQUIREMENTS, OR APPROVED EQUAL. TEST SHALL BE CONDUCTED BY A
<br />CERTIFIED TESTER G.C. SHALL PROVIDE WRITTEN REPORT OF PRECISION
<br />TEST TO OWNER'S REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF
<br />PROJECT.
<br />16. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC BACKPIRESSURE
<br />TEST OF ALL VAPOR RETURN LINES AS REQUIRED BY LOCAL REGULATIONS.
<br />11. CONTRACTOR SHALL DO ANY OTHER TESTING AS REQUIRED BY LOCAL
<br />REGULATIONS.
<br />18. CONSTRUCT NEW FUEL ISLANDS AS SHOWN ON DRAWINGS.
<br />19. BRAVO BOXES, TURBINE SUMPS, AND OVERFILL 5OXE5 ARE TO BE
<br />COMPLETELY SEALED AND WATER TESTED, AS EVIDENCED BY OWNER'S
<br />REPRESENTATIVE AS FOLLOWS: ^
<br />1. FILL WITH WATER TO HIGHEST PENETRATION.
<br />2. SPRAY PAINT TOP OF WATER
<br />20. PROVIDE AND INSTALL CONDUIT t WIRING FOR PETROLEUM SYSTEM(S) AND
<br />CANOPY LIGHTING. PROVIDE CONDUIT FOR FUTURE CARDREADER5 AND
<br />OTHER SITE ELECTRICAL AS INDICATED ON THE DRAWINGS.
<br />21. ALL CONDUIT IS TO BE 3/4" (MINIMUM) RIGID CONDUIT.
<br />22. INSTALL MONITORING SYSTEM WITH INTERSTITIAL PROBES, TURBINE SUMP
<br />PROBES, AND TAMC GAUGES, AND MONITOR CONTROL PANEL IN BUILDING
<br />PER DRAWINGS.
<br />23, INSTALL NEW DISPENSERS, AND CONTROL EQUIPMENT
<br />AS INDICATED ON SITE PLAN AND DESCRIBED IN THE EQUIPMENT LIST.
<br />24. NOT USED
<br />25, INSTALL NEW CONCRETE TANK AND DRIVE SLABS AND OTHER CONCRETE A5
<br />INDICATED ON SITE PLAN. CONCRETE SHALL HAVE A MINIMUM
<br />COMPRESSIVE STRENGTH AT 28 DAYS OF 2500 PSI.
<br />26. REPAIR AND/OR REPLACE A.C. PAVING AND BASE TO MATCH ORIGINAL IN
<br />AREAS DISTURBED BY WORK
<br />21, ANY ENVIRONMENTAL WORK REQUIRED OUTSIDE THE ABOVE SCOPE OF WORK
<br />SHALL BE DONE ON A TIME AND MATERIALS BASIS. RENTAL RECEIPTS,
<br />SUBCONTRACTOR INVOICES, MATERIAL RECEIPTS, AND DAILY LABOR TIME
<br />SHEETS SHALL BE REQUIRED TO SUPPORT GENERAL CONTRACTOR TIME AND
<br />MATERIAL INVOICES. SUCH WORK SHALL BE BILLED SEPARATELY.
<br />PIPING REMOVAL, SOIL TESTING PLAN
<br />1.0 GENERAL INFORMATION
<br />11
<br />LOCATION OF TANKS:
<br />ORLANDO'S
<br />5611 E. WATERLOO RD,
<br />Z
<br />W
<br />STOCKTON, CA
<br />M
<br />(20W 931-2942
<br />12
<br />OWNER:
<br />SAM 1 MARILYN ORLANDO
<br />9125 OAKWILDE AVE.
<br />STOCKTON, CA 95212
<br />(510) 651-8500
<br />1.3
<br />PROJECTED PROJECT START- 01 OCT 96
<br />1.4
<br />TANKS TO BE REMOVED:
<br />3 STEEL: 10 6000,1 0 10,000,
<br />I s 12,000 GALS.
<br />19
<br />CONTRACTOR:
<br />WALTON ENGINEERING, INC.
<br />GEOLOGIST:
<br />GRAYLAND ENVIRONMENTAL
<br />2131 QUAIL ST.
<br />DAVIS, CA 95616
<br />JEFF CLAYTON
<br />2.0 CLOSURE PROCEDURE -REMOVAL OF TANKS
<br />SAN JOAQUIN COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH TANK
<br />CLOSURE GUIDELINES AND SOIL AND GROUNDWATER SAMPLING
<br />GUIDELINES SHALL BE FOLLOWED, EXCEPT WHERE THE FOLLOWING
<br />SPECIFICATIONS ARE MORE RESTRICTIVE.
<br />REMOVE ALL PRODUCT FROM TANKS.
<br />REMOVE ALL RESIDUAL LIQUID, SOLIDS, OR SLUDGES,
<br />PURGE VAPORS FROM TANKS WITH SOLID CARBON DIOXIDE (DRY ICE)
<br />A MINIMUM OF 30 LBS. FOR GASOLINE AND 20 LBS. FOR DIESEL FOR EACH
<br />1,000 GALS. OF TANK CAPACITY AND PRESENT SALES SLIPS TO INSPECTOR
<br />PELLETIZED DRY ICE IS RECOMMENDED. CAP ALL OPENINGS EXCEPT
<br />VENT PIPE AND ALLOW TWO HOUR MINIMUM AND SIX HOUR MAXIMUM FOR
<br />OXYGEN DISPLACEMENT AFTER PUTTING CARBON DIOXIDE INTO THE
<br />TANKS. VENT PIPE OPENING TO BE CHECKED WITH A COMBUSTIBLE GAS
<br />DETECTOR TO DETERMINE IF TANK IS VAPOR FREE OR IF ADDITIONAL
<br />DRY ICE AND/OR TIME MAY BE REQUIRED.
<br />PLUG OR CAP ALL TANK OPENINGS LEAVING AN I/6" - 1/4" PRESSURE
<br />RELIEF HOLE IN ONE CAP AT THE TOP OF THE TANK
<br />VISUALLY INSPECT THE TANKS UPON REMOVAL. ALL EXTERNAL TANK
<br />SURFACES AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLES
<br />OR LEAKAGE. THE RESULTS OF SUCH INSPECTION SHALL BE
<br />DOCUMENTED IN WRITING, WITH PHOTOGRAPHS WHERE APPROPRIATE.
<br />PATCH ANY HOLES WITH APPROVED MATERIAL BEFORE TRANSPORTING
<br />TANKS TO D181005AL SITE,
<br />TWO SOIL SAMPLES SHALL BE ANALYZED FROM BENEATH THE TANK ONE
<br />FROM DIRECTLY BENEATH THE FILL PIPE. THE OTHER FROM A SIMILAR
<br />POSITION AT THE OPPOSITE END OF THE TANK IF OBVIOUSLY STAINED
<br />OR CONTAMINATED AREAS EXIST IN LOCATIONS OTHER THAN THE ABOVE
<br />LOCATIONS, THEN ADDITIONAL SOIL SAMPLES SHALL BE ANALYZED FROM
<br />THESE OBVIOUSLY STAINED OR CONTAMINATED AREAS.
<br />SOIL SAMPLE5 SHALL BE COLLECTED FROM THE NATIVE SOIL AT OR
<br />JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOIL.
<br />SAMPLES SHALL BE TAKEN USING A DRIVEN -TUBE TYPE SAMPLER
<br />CAPPED AND SEALED WITH INERT MATERIALS. FORMAL, SIGNED CHAIN -
<br />OF -CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND
<br />SUBMITTED WITH THE RESULTS TO THE REGULATING AGENCY.
<br />TO EXPEDITE THE PROCESS OF TANK REMOVAL, THE FOLLOWING
<br />ALTERNATIVE SAMPLING METHOD MAY BE USED:'
<br />A. IMMEDIATELY UPON REMOVAL OF THE TANK, A BACKHOE BUCKET OF
<br />NATIVE SOIL SHALL BE TAKEN FROM THE NATIVE SOIL TWO (2) f:EET
<br />BELOW THE SOIL/BACKFILL INTERFACE. THIS SOIL SHALL BE RAPIDLY
<br />BROUGHT TO THE SURFACE.
<br />B. APPROXIMATELY THREE INCHES SHALL BE RAPIDLY SCRAPED AWAY
<br />FROM THE SURFACE OF THIS SOIL. THEN A CLEAN BRASS TUBE (AT
<br />LEAST THREE INCHES LONG) SHALL BE DRIVEN INTO THE SOIL WITH A
<br />SUITABLE INSTRUMENT (WOODEN MALLET, ETC.).
<br />C. THES OF 5RA86 TUBE SHALL BE COVERED WITH ALUMINUM FOIL,
<br />-TI-IEk- ASTIR END CAPS, AND FINALLY WRAPPED WITH A SUITABLE
<br />TAPE.
<br />D. THE SAMPLE SHALL BE IMMEDIATELY PLACED ON ICE, OR DRY ICE,
<br />FOR TRANSPORT TO A LABORATORY. AGAIN, FORMAL CHAIN -OF -CUSTODY
<br />RECORDS SHALL BE MAINTAINED AND SUBMITTED FOR EACH SAMPLE.
<br />IF THE BOTTOM OF THE TANK 15 BELOW THE GROUNDWATER TABLE, THEN
<br />SOIL SAMPLES ARE NOT REQUIRED. IN THIS CASE, A WATER SAMPLE
<br />SHALL BE COLLECTED AS SOON AS POSSIBLE FROM THE SURFACE OF
<br />THE GROUNDWATER IN THE EXCAVATION. A CHECK SHALL INITIALLY BE
<br />MADE FOR ANY FREE FLOATING PRODUCT. IF NO FLOATING PRODUCT 16
<br />DETECTED, THEN A WATER SAMPLE SHALL BE TAKEN WITH A DEVICE
<br />DESIGNED TO REDUCE THE LOSS OF VOLATILE COMPONENTS. A BAILER
<br />15 A SUITABLE SAMPLING DEVICE. THE WATER SAMPLE SHALL BE
<br />IMMEDIATELY POURED INTO A VOLATILE ORSANIC ANALYSIS (`/OA) VIAL
<br />WITH AS LITTLE AGITATION AS POSSIBLE. A TEFLON SEPTUM SHALL BE
<br />USED TO SEAL THIS VIAL.
<br />SOIL AND WATER SAMPLES SHALL BE ANALYZED FOR TOTAL
<br />HYDROCARBONS BY THE METHODS OUTLINED IN "GUIDELINES FOR
<br />ADDRESSING FUEL LEAKS. CALIFORNIA REGIONAL WATER QUALITY
<br />CONTROL BOARD, SAN FRANCISCO BAY REGION - SEPTEMBER 1989."
<br />LOAD TANKS ON HIGHWAY CARRIER WITH PRESSURE RELIEF HOLE UP ON
<br />SAME DAY AS REMOVAL. UNLE85 THE TANKS HAVE BEEN TRIPLE RINSED,
<br />THE CARRIER MUST BE A LICENSED WASTE HAULER AND MANIFESTS
<br />MUST ACCOMPANY THE TANKS.
<br />3D REMOVAL OF PIPING
<br />PIPING TO BE REMOVED SHALL BE EMPTIED OF ALL CONTENTS PRIOR TO
<br />REMOVAL. PIPING SHALL BE STOCKPILED ON-81TE PRIOR TO DISPOSAL.
<br />VISUALLY INSPECT PIPE TRENCH FOR INDICATION OF LEAKAGE. A SOIL
<br />SAMPLE SHALL BE TAKEN AND ANALYZED FOR EACH TWENTY LINEAL
<br />FEET OF TRENCH IF INSPECTION OF TRENCH REVEALS EVIDENCE OF
<br />LEAKAGE. FOLLOW PROCEDURE LISTED IN SECTION 2.1 FOR SAMPLING
<br />AND ANALYSIS.
<br />ORLANDO'S
<br />5611 E. WATERLOO RD.
<br />5TOCKTON, CA 95215
<br />(20ci) 931-2942
<br />APN 081-100-52
<br />Ali ALTON
<br />lffw MW NGINEERING, INC.
<br />we
<br />P.O. BOX 1025
<br />843 RISKE LANE
<br />WEST SACRAMENTO, CA 85691
<br />(916) 312-1888
<br />FAX 313-1112
<br />THESE DRAWNGS AID SPECIFICATIONS, AS
<br />NSTRJ IENTS OF SERVICE, RE71WN THE
<br />FRCFERTY OF "TON D*NEERYa, NO
<br />AND &4ALL NOT M USED FOR ANY FL:P069
<br />OTHER THAN THOSE FOR U41CH THEY HAVE
<br />BEEN SUPPLIED OR PREPARED. THESE DRAWWA
<br />SHALL NOT BE FMPR')DUCED, COPIED OR TRACED
<br />LLATHCUT THE EXPRESS u.RITTEN CONSENT OF
<br />WALTCN EW.NEERYs, NC.
<br />COPYRIGHT © 1998
<br />DRAM BY TG
<br />CHKD' BY MEL
<br />DATE 30 AUCs 96
<br />SCALE NONE
<br />JOB NO. 26610
<br />REVISIONS
<br />DATE REV DESCRIPTION B
<br />SWEET TITLE
<br />GEN. NOTES
<br />SCOPE
<br />CLOSURE
<br />PET -5
<br />OF 6 SWEETS
<br />O
<br />Z
<br />W
<br />M
<br />I
<br />O
<br />�SNG
<br />e
<br />v' -
<br />Q
<br />(n
<br />ORLANDO'S
<br />5611 E. WATERLOO RD.
<br />5TOCKTON, CA 95215
<br />(20ci) 931-2942
<br />APN 081-100-52
<br />Ali ALTON
<br />lffw MW NGINEERING, INC.
<br />we
<br />P.O. BOX 1025
<br />843 RISKE LANE
<br />WEST SACRAMENTO, CA 85691
<br />(916) 312-1888
<br />FAX 313-1112
<br />THESE DRAWNGS AID SPECIFICATIONS, AS
<br />NSTRJ IENTS OF SERVICE, RE71WN THE
<br />FRCFERTY OF "TON D*NEERYa, NO
<br />AND &4ALL NOT M USED FOR ANY FL:P069
<br />OTHER THAN THOSE FOR U41CH THEY HAVE
<br />BEEN SUPPLIED OR PREPARED. THESE DRAWWA
<br />SHALL NOT BE FMPR')DUCED, COPIED OR TRACED
<br />LLATHCUT THE EXPRESS u.RITTEN CONSENT OF
<br />WALTCN EW.NEERYs, NC.
<br />COPYRIGHT © 1998
<br />DRAM BY TG
<br />CHKD' BY MEL
<br />DATE 30 AUCs 96
<br />SCALE NONE
<br />JOB NO. 26610
<br />REVISIONS
<br />DATE REV DESCRIPTION B
<br />SWEET TITLE
<br />GEN. NOTES
<br />SCOPE
<br />CLOSURE
<br />PET -5
<br />OF 6 SWEETS