MATERIAL AND WORKMANSHIP <br />I. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL <br />EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK <br />COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE <br />GRADE FOR THE PROCESS INTENDED. <br />2. THE CONTRACTOR SHALL FURNISH TO THE OII.NER'S AGENT FOR HIS <br />APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER, AND <br />OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE <br />PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND <br />MECHANICAL AND OTHER EQUIPMENT UA41CH THE CONTRACTOR CONTEMPLATES <br />INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S AGENT. <br />3. WHEN REQUIRED BY THESE DOCUMENTS OR WHEN CALLED FOR BY THE <br />OWNER'S AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR <br />APPROVAL FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES <br />WHICH HE CONTEMPLATES INCORPORATING IN THE WORK WHEN 80 <br />DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE <br />CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. <br />4, MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED <br />WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT <br />REJECTION. <br />5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND <br />REGULATIONS. <br />6, ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS <br />AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION <br />OF THE OWNER'8 ENGINEER <br />1. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR <br />LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS <br />PROJECT, IT 15 EXPECTED THAT THE MOST RESTRICTIVE CONDITIONS) <br />WOULD APPLY. <br />GENERAL CONDITIONS <br />I. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS 05HA TRAINING <br />COURSE PRIOR TO THE START OF WORK. CERTIFICATION OF THIS MUST BE <br />PROVIDED TO THE OU.NER'S ENGINEER PRIOR TO THE START OF WORK <br />2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER'5 <br />TRAINING REQUIREMENTS IN ACCORDANCE WITH 1994 CALIFORNIA UST <br />REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OWNER <br />CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKL15T <br />SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO <br />OWNER <br />3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK <br />MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH 1994 <br />CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO <br />OWNER CONTRACTOR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST <br />SUPPLIED TANK MANUFACTURER AND 5HALL FURNISH THE CHECKLIST TO <br />OWNER. <br />4. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES: <br />A. GENERAL ENGINEERING "A" <br />B. HAZARDOUS MATERIAL SUBSTANCE HANDLING l"HAZ") <br />5. CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL <br />HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER <br />AS "ADDITIONAL INSURED". <br />A. STATUTORY WF;KMAN'S COMPREHENSIVE LIABILITY <br />B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE <br />LIMIT OF NOT LESS THAN H,000,000 PER OCCURRENCE FOR BODILY <br />INJURY AND PROPERTY DAMAGE. <br />C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED <br />VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY <br />OF NOT LE58 THAN $1000,000 PER OCCURRENCE FOR BODILY INJURY AND <br />PROPERTY DAMAGE. <br />6. GENERAL CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND <br />SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE <br />SATISFACTORY COMPLETION OF ALL WORK SHOLLN ON, CALLED FOR, OR <br />REQUIRED BY THE DRAWINGS. <br />1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM <br />BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, <br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA <br />CONSTRUCTION SAFETY ORDERS, AND ANY OTHER APPLICABLE STATE, CITY, <br />OR COUNTY ORDINANCES. <br />8. NOT USED <br />S. NOT USED <br />10. GENERAL CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO <br />REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR <br />REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY <br />EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S <br />OPERATIONS. <br />11. ALL EXCAVATIONS 6HALL BE PERFORMED IN COMPLIANCE WITH 05HA AND <br />STATE REGULATIONS. THE CONTRACTOR IS REFERRED TO THE OSHA <br />BOOKLET, "EXCAVATING AND TRENCHING OPERATIONS", FOR A SAFE WORK <br />PRACTICES GUIDE FOR PERFORMING EXCAVATION WORK <br />12. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH <br />"AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS BUILT5" <br />SHALL BE COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY ON <br />APPROVED JOB COPY. <br />13. NOT USED <br />14. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS. <br />15. GOVERNING CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED <br />TO, THE STANDARDS OF THE FOLLOWING: <br />AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) <br />AMERICAN PETROLEUM INSTITUTE (API) <br />AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) <br />UNIFORM BUILDING CODE (UBC) <br />NATIONAL ELECTRIC CODE (NEC) <br />NATIONAL FIRE PROTECTION AGENCY (NFPA) <br />UNDERWRITER'S LABORATORIES, INC. (UL) <br />CALIFORNIA CODE OF REGULATIONS (CCR) <br />LOCAL ORDINANCES <br />16. SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN FOR THE <br />DURATION OF THE CONTRACT A SITE HEALTH 4 SAFETY PLAN THAT WILL <br />EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, <br />FOR TANK/LINE REMOVAL AND INSTALLATION, PRIOR WORK START, AND: <br />A: APPOINT AND EMPLOYEE AS THE SAFETY OFFICER WHO 15 QUALIFIED <br />AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE <br />HEALTH AND SAFETY PLAN, SUBMIT THE NAME AND QUALIFICATIONS OF <br />THE SAFETY OFFICER TO THE OLLNER'S AGENT PRIOR TO COMMENCING WORK <br />ON THE SITE. <br />B: THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE <br />NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES <br />NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE <br />WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS <br />OR HAZARDOUS SU55TANCES BE UNCOVERED. <br />G. CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH EMPLOYEES <br />AND SUPPLY THE MEETING MINUTES TO OWNER WHEN REQUESTED. <br />D: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP <br />OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE <br />CONDITION. IF THE CORRECTIVE ACTION 15 INSUFFICIENT IN THE <br />OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL <br />CORRECTIVE ACTION CAN BE IMPLEMENTED, <br />E: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM <br />CLASS RATING OF 2-A;0-5:C0-B•G WITHIN 50 FEET OF THE OPERATION. <br />11. UNDERGROUND SERVICE ALERT (U.S.A.) - THE CONTRACTOR SHALL NOTIFY <br />MEMBERS OF US,.A. 2 FULL WORKING DAYS IN ADVANCE OF PERFORMING <br />ANY EXCAVATION WORK BY CALLING THE TOLL-FREE ONE -CALL PROGRAM <br />NUMBER (800) 642-2444. <br />PETROLEUM WORK SCOPE <br />1. PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND <br />SCHEDULE THAT ALLOLL6 THE SITE'S STORE TO REMAIN OPEN TO THE <br />FULLEST EXTENT POSSIBLE. <br />2. FENCE OFF WORK AREA WITH &' HIGH CHAIN LINK FENCE. POST "KEEP <br />OUT" SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH WORK DAY <br />SECURE FENCING PANELS TOGETHER. <br />3. FLUSH, CUT, AND REMOVE PRODUCT LINES FROM EXISTING TANKS TO <br />DISPENSER ISLANDS. <br />4. REMOVE ALL EXISTING FUEL DISPENSERS, ISLANDS, BARRICADES, FUEL <br />LINES, ASPHALT AND CONCRETE SURFACES AS REQUIRED, IN <br />PREPARATION FOR INSTALLATION OF NEW AS SHOWN ON DRAWINGS. ANY <br />SALVAGEABLE EQUIPMENT TO BE REMOVED FROM SITE AS DIRECTED BY <br />OWNER REPRESENTATIVE. <br />5. OWNER WILL CONTRACT WITH AND FURNISH CONSULTANTS TO PERFORM SOIL <br />AND/OR WATER TESTING UPON PIPING REMOVAL IN ACCORDANCE WITH <br />PIPING REMOVAL PLAN AND LOCAL REGULATIONS. <br />6. CONTRACTOR SHALL PLACE EXCAVATED SOIL ON, AND SHALL COVER WITH, <br />4 MIL. PLASTIC UNTIL SOIL 15 REMOVED, ANY 601L TO BE STOCKPILED ON <br />SITE FOR SAMPLING PRIOR TO OFF -HAUL BY OTHERS AS DIRECTED BY <br />OU.NER <br />1. OWNER SHALL PROVIDE FOR TRANSPORTATION AND DISP06AL OF ALL <br />EXCAVATED 501L AFTER COMPLETION OF ANY NECE55ARY REMEDIATION, <br />INCLUDING AERATION. <br />8. IF REQUIRED FOR ABANDONED EXCAVATIONS, BACKFILL ONCE ALL SAMPLING <br />AND/OR OVER -EXCAVATION 18 COMPLETED. BACKFILL MUST BE ENGINEERED <br />FILL COMPACTED TO e5%. THE CONTRACTOR 18 RESPONSIBLE FOR <br />CERTIFYING THE COMPACTION. <br />J. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW EQUIPMENT, <br />10. INSTALL "TYPAR" FILTER FABRIC LINER IN PIPING TRENCHES, PER <br />DRAWINGS, WHERE REQUIRED BY WET -HOLE CONDITIONS. <br />11. INSTALL EQUIPMENT AS LISTED IN EQUIPMENT LIST INCLUDING <br />SALVAGEABLE EQUIPMENT TO BE REINSTALLED, IF ANY, AND PROVIDE AND <br />INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE <br />PETROLEUM SYSTEM. <br />12. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY <br />CONTAINMENT LINES PER DRAWINGS. CURRENT MANUFACTURER'S <br />INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE <br />PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS <br />SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP 15 COMPLETED. <br />A: PRODUCT PIPING: 2" PRIMARY PIPING WITH 3" CONTAINMENT <br />SYSTEM A$ APPROVED BY OU.NER ALL PIPING AND CONTAINMENT SYSTEMS <br />SHALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT SYSTEM SHALL <br />BE BY THE SAME MANUFACTURER, WITH THE SAME SERIES ADHESIVES <br />AND/OR FITTINGS. <br />B: VENT/VAPOR PIPING: RED THREAD IIA AND RED THREAD 11 WITH <br />FITTINGS AND 1000 AND 8000 SERIES ADHESIVE, OR AMERON DUALOY <br />3000L WITH ALCOHOL FITTINGS AND RP48 ADHESIVE. DO NOT MIX <br />MANUFACTURER'S MATERIALS. <br />C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN <br />TRAINED BY MANUFACTURER <br />D: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE <br />40, OR EXTRA STRONG. GALVANIZED PIPE 15 NOT ALLOWED. FITTINGS <br />SHALL BE 300 PSI MALLEABLE IRON. <br />E, ALL STEEL PIPE BELOW GRADE 15 TO BE DOUBLE WRAPPED WITH 20 <br />MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL <br />TAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP, <br />F, ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT <br />WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL <br />COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH <br />PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 100% METHANOL, WHICH <br />SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET. <br />G: G.C. SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL <br />MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS. <br />M DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER <br />TANKS SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS SHOWN ON " <br />DRAWINGS. MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING <br />15 NOT SHOWN ON SITE PLAN, G.C. SHALL RUN LINES THE M05T DIRECT <br />ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. <br />14, PIPING SYSTEMS SHALL BE TESTED PER CURRENT MANUFACTURER'5 <br />INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE <br />PRECEDENCE OVER OTHER INSTRUCTIONS. <br />A: G.G. TO NOTIFY OU.NER'S REPRESENTATIVE TWO WORKING DAYS PRIOR <br />TO LINE TESTING. OU.NER'S REPRESENTATIVE SHALL WITNE58 ALL LINE <br />TESTING. MARK TEST PRESSURES ON GAUGE WITH ELECTRICAL TAPE AT <br />BEGINNING OF TESTS. PRESSURE SHALL HOLD FOR AT LEAST ONE (I) <br />HOUR AND BE WITNESSED BY OWNER'S REPRESENTATIVE. DO NOT BACKFILL <br />TRENCHES UNTIL AUTHORIZED BY OWNER'S REPRESENTATIVE. <br />B: TEST PRESSURES SHALL BE: <br />2" 50 1051 AND APPLY SOAP SOLUTION. <br />3" 40 PSI AND APPLY SOAP SOLUTION. <br />3" - SECONDARY - 5 PSI AND APPLY SOAP SOLUTION. <br />C. CAUTION: DISCONNECT FLEX CONNECTOR FROM STP AND CAP PRIOR <br />TO TESTING. APPLY d RELEASE PRE65URE SLOWLY. VENT/VAPOR SYSTEM <br />SHALL BE TESTED FROM TOP OF VENT, THROUGH MANIFOLD(5), EXTRACTOR <br />BASE AND RISER, STAGE I CONTAINMENT MANHOLES, STAGE II VAPOR <br />LINES Tq ISLANDS AND STAGE II FLEX CONNECTORS AT DISPENSER(S). <br />D. SLOWLY PRESSURIZE PRODUCT LINES AND VENT/VAPOR SYSTEM TO 50 <br />1051. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS AND FITTINGS, <br />CORRECT ANY LEAKS AND RETEST. <br />E. SLOWLY RELIEVE PRESSURE FROM VAPORNENT SYSTEM AND REMOVE <br />PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE <br />PRESSURE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVING 15 <br />COMPLETE. <br />F. SECONDARY PIPE MUST BE PROPERLY CUT. INSPECT ALL PRIMARY <br />PIPE SURFACES. PRE85URIZE SECONDARY PIPE TO 5 PSI AND SOAP ALL <br />PIPE SURFACE AND FITTINGS. PRESSURE ON THE PIPING SECONDARY <br />SPACE SHALL BE MAINTAINED UNTIL AFTER THE PAVING IS IN PLACE OVER <br />TANK FIELD AND PIPING RUNS, AND SHALL BE WITNESSED BY THE OWNER'S <br />REPRESENTATIVE. <br />G. AFTER BEING WITNESSED BY OWNER'S REPRESENTATIVE, REMOVE <br />PRES fzE FROM PRODUCT LINES AND AIR FROM SECONDARY LINES AFTER <br />FAVI IS IN PLACE <br />. 8HAtL PERFORM PRECISION TEST ON PRODUCT LINES AFTER PAVING <br />15 COMPLETE AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISION <br />LINE TEST SHALL BE IN ACCORDANCE WITH NFPA 329, LOCAL <br />REQUIREMENTS, OR APPROVED EQUAL. TEST SHALL BE CONDUCTED BY A <br />CERTIFIED TESTER G.C. SHALL PROVIDE WRITTEN REPORT OF PRECISION <br />TEST TO OWNER'S REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF <br />PROJECT. <br />16. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC BACKPIRESSURE <br />TEST OF ALL VAPOR RETURN LINES AS REQUIRED BY LOCAL REGULATIONS. <br />11. CONTRACTOR SHALL DO ANY OTHER TESTING AS REQUIRED BY LOCAL <br />REGULATIONS. <br />18. CONSTRUCT NEW FUEL ISLANDS AS SHOWN ON DRAWINGS. <br />19. BRAVO BOXES, TURBINE SUMPS, AND OVERFILL 5OXE5 ARE TO BE <br />COMPLETELY SEALED AND WATER TESTED, AS EVIDENCED BY OWNER'S <br />REPRESENTATIVE AS FOLLOWS: ^ <br />1. FILL WITH WATER TO HIGHEST PENETRATION. <br />2. SPRAY PAINT TOP OF WATER <br />20. PROVIDE AND INSTALL CONDUIT t WIRING FOR PETROLEUM SYSTEM(S) AND <br />CANOPY LIGHTING. PROVIDE CONDUIT FOR FUTURE CARDREADER5 AND <br />OTHER SITE ELECTRICAL AS INDICATED ON THE DRAWINGS. <br />21. ALL CONDUIT IS TO BE 3/4" (MINIMUM) RIGID CONDUIT. <br />22. INSTALL MONITORING SYSTEM WITH INTERSTITIAL PROBES, TURBINE SUMP <br />PROBES, AND TAMC GAUGES, AND MONITOR CONTROL PANEL IN BUILDING <br />PER DRAWINGS. <br />23, INSTALL NEW DISPENSERS, AND CONTROL EQUIPMENT <br />AS INDICATED ON SITE PLAN AND DESCRIBED IN THE EQUIPMENT LIST. <br />24. NOT USED <br />25, INSTALL NEW CONCRETE TANK AND DRIVE SLABS AND OTHER CONCRETE A5 <br />INDICATED ON SITE PLAN. CONCRETE SHALL HAVE A MINIMUM <br />COMPRESSIVE STRENGTH AT 28 DAYS OF 2500 PSI. <br />26. REPAIR AND/OR REPLACE A.C. PAVING AND BASE TO MATCH ORIGINAL IN <br />AREAS DISTURBED BY WORK <br />21, ANY ENVIRONMENTAL WORK REQUIRED OUTSIDE THE ABOVE SCOPE OF WORK <br />SHALL BE DONE ON A TIME AND MATERIALS BASIS. RENTAL RECEIPTS, <br />SUBCONTRACTOR INVOICES, MATERIAL RECEIPTS, AND DAILY LABOR TIME <br />SHEETS SHALL BE REQUIRED TO SUPPORT GENERAL CONTRACTOR TIME AND <br />MATERIAL INVOICES. SUCH WORK SHALL BE BILLED SEPARATELY. <br />PIPING REMOVAL, SOIL TESTING PLAN <br />1.0 GENERAL INFORMATION <br />11 <br />LOCATION OF TANKS: <br />ORLANDO'S <br />5611 E. WATERLOO RD, <br />Z <br />W <br />STOCKTON, CA <br />M <br />(20W 931-2942 <br />12 <br />OWNER: <br />SAM 1 MARILYN ORLANDO <br />9125 OAKWILDE AVE. <br />STOCKTON, CA 95212 <br />(510) 651-8500 <br />1.3 <br />PROJECTED PROJECT START- 01 OCT 96 <br />1.4 <br />TANKS TO BE REMOVED: <br />3 STEEL: 10 6000,1 0 10,000, <br />I s 12,000 GALS. <br />19 <br />CONTRACTOR: <br />WALTON ENGINEERING, INC. <br />GEOLOGIST: <br />GRAYLAND ENVIRONMENTAL <br />2131 QUAIL ST. <br />DAVIS, CA 95616 <br />JEFF CLAYTON <br />2.0 CLOSURE PROCEDURE -REMOVAL OF TANKS <br />SAN JOAQUIN COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH TANK <br />CLOSURE GUIDELINES AND SOIL AND GROUNDWATER SAMPLING <br />GUIDELINES SHALL BE FOLLOWED, EXCEPT WHERE THE FOLLOWING <br />SPECIFICATIONS ARE MORE RESTRICTIVE. <br />REMOVE ALL PRODUCT FROM TANKS. <br />REMOVE ALL RESIDUAL LIQUID, SOLIDS, OR SLUDGES, <br />PURGE VAPORS FROM TANKS WITH SOLID CARBON DIOXIDE (DRY ICE) <br />A MINIMUM OF 30 LBS. FOR GASOLINE AND 20 LBS. FOR DIESEL FOR EACH <br />1,000 GALS. OF TANK CAPACITY AND PRESENT SALES SLIPS TO INSPECTOR <br />PELLETIZED DRY ICE IS RECOMMENDED. CAP ALL OPENINGS EXCEPT <br />VENT PIPE AND ALLOW TWO HOUR MINIMUM AND SIX HOUR MAXIMUM FOR <br />OXYGEN DISPLACEMENT AFTER PUTTING CARBON DIOXIDE INTO THE <br />TANKS. VENT PIPE OPENING TO BE CHECKED WITH A COMBUSTIBLE GAS <br />DETECTOR TO DETERMINE IF TANK IS VAPOR FREE OR IF ADDITIONAL <br />DRY ICE AND/OR TIME MAY BE REQUIRED. <br />PLUG OR CAP ALL TANK OPENINGS LEAVING AN I/6" - 1/4" PRESSURE <br />RELIEF HOLE IN ONE CAP AT THE TOP OF THE TANK <br />VISUALLY INSPECT THE TANKS UPON REMOVAL. ALL EXTERNAL TANK <br />SURFACES AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLES <br />OR LEAKAGE. THE RESULTS OF SUCH INSPECTION SHALL BE <br />DOCUMENTED IN WRITING, WITH PHOTOGRAPHS WHERE APPROPRIATE. <br />PATCH ANY HOLES WITH APPROVED MATERIAL BEFORE TRANSPORTING <br />TANKS TO D181005AL SITE, <br />TWO SOIL SAMPLES SHALL BE ANALYZED FROM BENEATH THE TANK ONE <br />FROM DIRECTLY BENEATH THE FILL PIPE. THE OTHER FROM A SIMILAR <br />POSITION AT THE OPPOSITE END OF THE TANK IF OBVIOUSLY STAINED <br />OR CONTAMINATED AREAS EXIST IN LOCATIONS OTHER THAN THE ABOVE <br />LOCATIONS, THEN ADDITIONAL SOIL SAMPLES SHALL BE ANALYZED FROM <br />THESE OBVIOUSLY STAINED OR CONTAMINATED AREAS. <br />SOIL SAMPLE5 SHALL BE COLLECTED FROM THE NATIVE SOIL AT OR <br />JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOIL. <br />SAMPLES SHALL BE TAKEN USING A DRIVEN -TUBE TYPE SAMPLER <br />CAPPED AND SEALED WITH INERT MATERIALS. FORMAL, SIGNED CHAIN - <br />OF -CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND <br />SUBMITTED WITH THE RESULTS TO THE REGULATING AGENCY. <br />TO EXPEDITE THE PROCESS OF TANK REMOVAL, THE FOLLOWING <br />ALTERNATIVE SAMPLING METHOD MAY BE USED:' <br />A. IMMEDIATELY UPON REMOVAL OF THE TANK, A BACKHOE BUCKET OF <br />NATIVE SOIL SHALL BE TAKEN FROM THE NATIVE SOIL TWO (2) f:EET <br />BELOW THE SOIL/BACKFILL INTERFACE. THIS SOIL SHALL BE RAPIDLY <br />BROUGHT TO THE SURFACE. <br />B. APPROXIMATELY THREE INCHES SHALL BE RAPIDLY SCRAPED AWAY <br />FROM THE SURFACE OF THIS SOIL. THEN A CLEAN BRASS TUBE (AT <br />LEAST THREE INCHES LONG) SHALL BE DRIVEN INTO THE SOIL WITH A <br />SUITABLE INSTRUMENT (WOODEN MALLET, ETC.). <br />C. THES OF 5RA86 TUBE SHALL BE COVERED WITH ALUMINUM FOIL, <br />-TI-IEk- ASTIR END CAPS, AND FINALLY WRAPPED WITH A SUITABLE <br />TAPE. <br />D. THE SAMPLE SHALL BE IMMEDIATELY PLACED ON ICE, OR DRY ICE, <br />FOR TRANSPORT TO A LABORATORY. AGAIN, FORMAL CHAIN -OF -CUSTODY <br />RECORDS SHALL BE MAINTAINED AND SUBMITTED FOR EACH SAMPLE. <br />IF THE BOTTOM OF THE TANK 15 BELOW THE GROUNDWATER TABLE, THEN <br />SOIL SAMPLES ARE NOT REQUIRED. IN THIS CASE, A WATER SAMPLE <br />SHALL BE COLLECTED AS SOON AS POSSIBLE FROM THE SURFACE OF <br />THE GROUNDWATER IN THE EXCAVATION. A CHECK SHALL INITIALLY BE <br />MADE FOR ANY FREE FLOATING PRODUCT. IF NO FLOATING PRODUCT 16 <br />DETECTED, THEN A WATER SAMPLE SHALL BE TAKEN WITH A DEVICE <br />DESIGNED TO REDUCE THE LOSS OF VOLATILE COMPONENTS. A BAILER <br />15 A SUITABLE SAMPLING DEVICE. THE WATER SAMPLE SHALL BE <br />IMMEDIATELY POURED INTO A VOLATILE ORSANIC ANALYSIS (`/OA) VIAL <br />WITH AS LITTLE AGITATION AS POSSIBLE. A TEFLON SEPTUM SHALL BE <br />USED TO SEAL THIS VIAL. <br />SOIL AND WATER SAMPLES SHALL BE ANALYZED FOR TOTAL <br />HYDROCARBONS BY THE METHODS OUTLINED IN "GUIDELINES FOR <br />ADDRESSING FUEL LEAKS. CALIFORNIA REGIONAL WATER QUALITY <br />CONTROL BOARD, SAN FRANCISCO BAY REGION - SEPTEMBER 1989." <br />LOAD TANKS ON HIGHWAY CARRIER WITH PRESSURE RELIEF HOLE UP ON <br />SAME DAY AS REMOVAL. UNLE85 THE TANKS HAVE BEEN TRIPLE RINSED, <br />THE CARRIER MUST BE A LICENSED WASTE HAULER AND MANIFESTS <br />MUST ACCOMPANY THE TANKS. <br />3D REMOVAL OF PIPING <br />PIPING TO BE REMOVED SHALL BE EMPTIED OF ALL CONTENTS PRIOR TO <br />REMOVAL. PIPING SHALL BE STOCKPILED ON-81TE PRIOR TO DISPOSAL. <br />VISUALLY INSPECT PIPE TRENCH FOR INDICATION OF LEAKAGE. A SOIL <br />SAMPLE SHALL BE TAKEN AND ANALYZED FOR EACH TWENTY LINEAL <br />FEET OF TRENCH IF INSPECTION OF TRENCH REVEALS EVIDENCE OF <br />LEAKAGE. FOLLOW PROCEDURE LISTED IN SECTION 2.1 FOR SAMPLING <br />AND ANALYSIS. <br />ORLANDO'S <br />5611 E. WATERLOO RD. <br />5TOCKTON, CA 95215 <br />(20ci) 931-2942 <br />APN 081-100-52 <br />Ali ALTON <br />lffw MW NGINEERING, INC. <br />we <br />P.O. BOX 1025 <br />843 RISKE LANE <br />WEST SACRAMENTO, CA 85691 <br />(916) 312-1888 <br />FAX 313-1112 <br />THESE DRAWNGS AID SPECIFICATIONS, AS <br />NSTRJ IENTS OF SERVICE, RE71WN THE <br />FRCFERTY OF "TON D*NEERYa, NO <br />AND &4ALL NOT M USED FOR ANY FL:P069 <br />OTHER THAN THOSE FOR U41CH THEY HAVE <br />BEEN SUPPLIED OR PREPARED. THESE DRAWWA <br />SHALL NOT BE FMPR')DUCED, COPIED OR TRACED <br />LLATHCUT THE EXPRESS u.RITTEN CONSENT OF <br />WALTCN EW.NEERYs, NC. <br />COPYRIGHT © 1998 <br />DRAM BY TG <br />CHKD' BY MEL <br />DATE 30 AUCs 96 <br />SCALE NONE <br />JOB NO. 26610 <br />REVISIONS <br />DATE REV DESCRIPTION B <br />SWEET TITLE <br />GEN. NOTES <br />SCOPE <br />CLOSURE <br />PET -5 <br />OF 6 SWEETS <br />O <br />Z <br />W <br />M <br />I <br />O <br />�SNG <br />e <br />v' - <br />Q <br />(n <br />ORLANDO'S <br />5611 E. WATERLOO RD. <br />5TOCKTON, CA 95215 <br />(20ci) 931-2942 <br />APN 081-100-52 <br />Ali ALTON <br />lffw MW NGINEERING, INC. <br />we <br />P.O. BOX 1025 <br />843 RISKE LANE <br />WEST SACRAMENTO, CA 85691 <br />(916) 312-1888 <br />FAX 313-1112 <br />THESE DRAWNGS AID SPECIFICATIONS, AS <br />NSTRJ IENTS OF SERVICE, RE71WN THE <br />FRCFERTY OF "TON D*NEERYa, NO <br />AND &4ALL NOT M USED FOR ANY FL:P069 <br />OTHER THAN THOSE FOR U41CH THEY HAVE <br />BEEN SUPPLIED OR PREPARED. THESE DRAWWA <br />SHALL NOT BE FMPR')DUCED, COPIED OR TRACED <br />LLATHCUT THE EXPRESS u.RITTEN CONSENT OF <br />WALTCN EW.NEERYs, NC. <br />COPYRIGHT © 1998 <br />DRAM BY TG <br />CHKD' BY MEL <br />DATE 30 AUCs 96 <br />SCALE NONE <br />JOB NO. 26610 <br />REVISIONS <br />DATE REV DESCRIPTION B <br />SWEET TITLE <br />GEN. NOTES <br />SCOPE <br />CLOSURE <br />PET -5 <br />OF 6 SWEETS <br />