My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
6732
>
2300 - Underground Storage Tank Program
>
PR0231830
>
REMOVAL REMOVAL 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:22 PM
Creation date
11/7/2018 9:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 2005
RECORD_ID
PR0231830
PE
2361
FACILITY_ID
FA0004030
FACILITY_NAME
THREE PALMS GROCERY
STREET_NUMBER
6732
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10110001
CURRENT_STATUS
02
SITE_LOCATION
6732 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\6732\PR0231830\REMOVAL 2005.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING, PROTOCOL FOR ROUTINE TANK REMO 2-LS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br /> contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted within five (5) <br /> working days pursuant to California Health & Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> H (Gallons) of SOIL SAMPLES <br /> < 1.000 1 per Tank Fill OR Pum End of Tank <br /> 1,000 - 10,000 2 per Tank 1 at each End of Tank <br /> >_10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br /> TANK & PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER of <br /> N (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank ends at soil/ groundwater 1 <br /> interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 4 ends at soil/ 1 <br /> groundwater interface <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> H (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1.000 - 10.000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10.000 5 OR More per Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> EH 23 046 (Revised 10/19/98) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.