Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> TANKS r <br /> UNDERGROUND STORAGE TANKS- TANK PAGE 2 <br /> Pae of <br /> VI.PIPING CONSTRUCTION Icnect all that ly) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE ❑1.PRESSURE [12.SUCTION 3.GRAVITY 458. ❑1.PRESSURE ❑2.SUCTION PC.GRAVITY 459, <br /> CONSTRUCTION/ JW4.SINGLE WALL [13.LINED TRENCH ❑99.OTHER 460. qq.�1�.SINGLE WALL <br /> ❑95.UNKNOWN <br /> MANUFACTURER P-` 462. <br /> [12.DOUBLE WALL [195.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER 461. MANUFACTURER 463. <br /> I.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL . ARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL <br /> b`2.STAINLESS STEEL ❑7.GALVANIZED STEEL / 2.STAINLESS STEEL 44 [17.GALVANIZED STEEL <br /> [13.PLASTIC COMPATIBLE WITH CONTENTS ❑95.UNKNOWN [13.PLASTIC COMPATIBLE W/CONTENTS ❑S.FLEXIBLE(HDPE) ❑99.OTHER <br /> [14.FIBERGLASS [18.FLEXIBLE(HDPE) ❑99.OTHER ❑4.FIBERGLASS Cl 9.CATHODIC PROTECTION <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 469. ❑5.STEEL W/COATING [195.UNKNOWN 465. <br /> VIL PIPING LEAK DETECCION(Cneck all nut ) Ad 'tion oOhe moNtmirw shall be abmhtdmthe bal .) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 4%. SINGLE WALL PIPING 467. <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑L ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP [31. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT-OFF FOR LEAK SYSTEM FAILURE,AND SYSTEM DISCONNECTION SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION <br /> +AUDIBLE AND VISUAL ALARMS. +AUDIBLE AND VISUAL ALARMS. <br /> [12. MONTHLY 0.2 GPH TEST [12. MONTHLY 0.2 GPH TEST <br /> [33. ANNUAL INTEGRITY TEST(0.1 GPH) [13. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> 04. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> [15. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING [15. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): [16. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> ❑7. SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW [17. SELF MONITORING <br /> C39. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> [18. DAILY VISUAL MONITORING <br /> [19. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check a0 that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check me) ALARMS AND(Check one) <br /> ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> Oc. NO AUTO PUMP SHUT OFF �c. NO AUTO PUMP SHUTOFF <br /> ❑11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT El II AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) [312. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> [113, CONTINUOUS SUMP SENSOR,AUDIBLE AND VISUAL ALARMS ❑13.CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF 014. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> [115. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW <br /> SHUT OFF OR RESTRICTION MI5.AUTOMATIC LE LEAK DETECTOR(3.0 GPH TEST) <br /> [316. ANNUAL INTEGRITY TEST(0.1 GPH) [116.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> [317. DAILY VISUAL CHECK ❑17.DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 468. ❑l. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4. DAILY VISUAL CHECK 469, <br /> DATE INSTALLED C]2. CONTINUOUS DISPENSER PAN SENSOR,AUDIBLE AND VISUAL ALARMS [15. TRENCH/LINER MONITORING <br /> ❑3. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR 6. NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> SIGNATURE OF OWN O E ATOR DATE: 470, <br /> 7 <br /> NAME OF OWNER/pPERATOR(print): TITLE OF OWNER/OPERATOR: fin' <br /> I ` '%- cera �2 cmc�e Cp�, Pro i�. <br /> Permit Number(Agency use only) 473. Pmmh Approved By(Agency use only) 474. Permit Expiration Dare(Agency use only) 475. <br /> UPCF hwfwm-b(1/99)-3/4 hup://www.unidocs.org Rev.02/16/00 <br />