Laserfiche WebLink
Page 1 of 1 <br /> Ty, David <br /> From: Trigueiro, Gerard <br /> Sent: Wednesday, January 21, 2004 5:10 PM <br /> To: Ty, David, Heslop, Kris <br /> Cc: Wong, Penny; Sutliff, Ralph; Lim, Michael <br /> Subject: R & L Diesel - Environmental Review <br /> We have reviewed the letter from Geological Technics Inc. ("GTI") regarding their review of the <br /> Phase I and Transaction Screen, as well as their Site Reconnaissance. Based upon GTI's <br /> review and inspection, the Bank will require the following: <br /> I2. Closure Letter on the Underground Storage Tank that was closed in place. <br /> to Closure Letter on the cleanup of the former steam cleaning holding pit. <br /> I0�" 3. Installation of"overhead protection" for the two ASTs, drums and a metal bin located in <br /> 4Q," b the new steam cleaning location. <br /> t Z 4. Installation of"protection from impact" around the diesel AST at the southwest corner of <br /> the steam cleaning area. <br /> 5. Removal of the AST connected to the dynamometer, with proper disposal, permits, and <br /> clearances (if required). <br /> Copy of letter from SJCEHD which stated that they "found no evidence to indicate an <br /> unauthorized release of petroleum hydrocarbons". <br /> If you have any questions, please advise Michael Lim or myself. <br /> Gerard Trigueiro <br /> Credit Risk Management <br /> Union Safe Deposit Bank <br /> (209) 946-5176 <br /> (209) 948-4963 Fax <br /> 1/22/2004 <br />