My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 1993 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2300 - Underground Storage Tank Program
>
PR0231882
>
BILLING 1993 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 1:56:52 PM
Creation date
11/7/2018 10:00:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1993 - 2004
RECORD_ID
PR0231882
PE
2381
FACILITY_ID
FA0003555
FACILITY_NAME
AMERICAN MOULDING & MILLWORK
STREET_NUMBER
2801
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\2801\PR0231882\BILLING 1993 - 2004.PDF
QuestysFileName
BILLING 1993 - 2004
QuestysRecordDate
12/1/2016 5:36:50 PM
QuestysRecordID
3267713
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rF <br /> `LSTATE OF CALIFORNIA � <br /> STATE WATER RESOURCES CONTROL BOARD <br /> / UNDERGROUND STORAGE TANK PERMIT APPLICATION • FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ ] PERMANENTLY CLOSED NSITE <br /> ONE ITEM E-1 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ e TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 01-I;-zI I <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK 1. .# <br /> d ' B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYIYEAR) vn lC D. TANK CAPACITY IN GALLONS: <br /> ILTANKCO S IF A-1 IS M ARKED,COM PLETE ITEM C. <br /> 1 MOTOR VEHICLE FUEL ❑ 4 OIL 0. / C ❑ 1eUNLEADEO 3 DIESEL ❑ g AVIATION GAS <br /> A hGI/ 4 GASAHOL PREMIUM ❑ T METHANOL <br /> ❑ 2 PETROLEUM ❑ SO EMPTY 1 PRODUCT ❑ 1bUNLEAD D ❑ 5 JETFUEL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ gg OTHER (DESCRIBE IN ITEM D. BELOWI <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.4: <br /> III. TANK CONSTRUCT MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALL THAT APPLIES IN BOX D AND <br /> 121�1 DOUBLE WALL F-] 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> A. TYPE OF ❑ <br /> SYSTEM ❑ 2 SINGLE WALL 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B. TANK 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ Z ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> MATERIAL <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR Q 5 GLASS LINING ❑ 6 UNLINED UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONENKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U Z STEEL /COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECT KIN A UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 INTERSTITIAL MONITORING ❑ OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GANGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ ? INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LASa SED(MO/DAYZ) 2.ESTIMATED QUANTITY OF /y, 3.WAS TANK FILLED WITH YES [7] NO <br /> J SUBSTANCE REMAINING L/ GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED!.IGNATUREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK III <br /> STATE I.D.# 3 l-13 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DAT .-So - 9 <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. I <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br /> FORM B (12-91) "1111.101 'q f ^//A(1,p,}/,' FOIIOON6R6 <br /> v '` `1(1✓" <br />
The URL can be used to link to this page
Your browser does not support the video tag.