My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:49:17 PM
Creation date
11/7/2018 10:04:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
7/23/2018 6:35:09 PM
QuestysRecordID
3946152
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Cauging/SIR Equipment: <br /> ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑X Check this box if no tank gauging or SIR equipment is installed. <br /> This Section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com fete the followin checklist: <br /> ❑Yes ❑No* Has all input\\i ring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No* Was accuracy of system product level readings tested? <br /> ❑Yes ❑No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑No* Were all probes reinstalled properly? <br /> ❑Yes I ❑No* lWere all items on the equipment manufacturer's maintenance checklist completed? <br /> *1 n the Section 11,W.ore,describe how and when these deficiencies were or will be corrected. <br /> C.Line Leak Detectors(LLD): © Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑Yes ❑No 4' 1'or equipment start-up or annual equi pment certification,was a leak simulated to verify LLD perform an ce?(Check <br /> ❑N/A all that apply) Simulated leak rate: ❑3g.p.h.; ❑O.ig.p.h;❑0.2g.p.h. <br /> ❑Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements'? <br /> ❑Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electmnic LI_Ds. does the turbine automatically shut offifthe LLD detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LI.,Ds, does the turbine automatically shut off ifany portion of the monitoring system is disabled or <br /> ❑N/A disconnected'? <br /> ❑Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑N/A tads a test? <br /> ❑Yes ❑No* Forelectronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑Yes ❑ No* Were all items on the eqW pment manufacturer's maintenance checklist completed? <br /> *In the Section 11,below,describehow and when these.deficiencies Frere or mill be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.