Laserfiche WebLink
F. In-Tank Cauging/SIR Equipment: <br /> ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑X Check this box if no tank gauging or SIR equipment is installed. <br /> This Section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com fete the followin checklist: <br /> ❑Yes ❑No* Has all input\\i ring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No* Was accuracy of system product level readings tested? <br /> ❑Yes ❑No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑No* Were all probes reinstalled properly? <br /> ❑Yes I ❑No* lWere all items on the equipment manufacturer's maintenance checklist completed? <br /> *1 n the Section 11,W.ore,describe how and when these deficiencies were or will be corrected. <br /> C.Line Leak Detectors(LLD): © Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑Yes ❑No 4' 1'or equipment start-up or annual equi pment certification,was a leak simulated to verify LLD perform an ce?(Check <br /> ❑N/A all that apply) Simulated leak rate: ❑3g.p.h.; ❑O.ig.p.h;❑0.2g.p.h. <br /> ❑Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements'? <br /> ❑Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electmnic LI_Ds. does the turbine automatically shut offifthe LLD detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LI.,Ds, does the turbine automatically shut off ifany portion of the monitoring system is disabled or <br /> ❑N/A disconnected'? <br /> ❑Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑N/A tads a test? <br /> ❑Yes ❑No* Forelectronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑Yes ❑ No* Were all items on the eqW pment manufacturer's maintenance checklist completed? <br /> *In the Section 11,below,describehow and when these.deficiencies Frere or mill be corrected. <br /> H. Comments: <br />