Laserfiche WebLink
A INA Fiberglass-Composite Pipe Division <br /> AMERON <br /> INTERNATIONAL DUALOY 3000@ <br /> INSTALLATION PROCEDURES TRAINING <br /> CERTIFICATE OF COMPLETION <br /> Ameron International Fiberglass-Composite Pipe Division <br /> hereby certifies that <br /> Mick Jordan <br /> ..........Farad%so...MeGhanicab... ne............... <br /> has completed training on the proper installation procedures for <br /> the Dualoy"�' 3000 UL Listed fiberglass piping systems <br /> indicated below as manufactured by the <br /> Fiberglass-Composite Pipe Division of <br /> Ameron International Corporation. <br /> DUALOY 3000 <br /> Rk /L 4% /LCX <br /> Certificate valid for one year from date of issue <br /> California <br /> Location of Training <br /> April 1, 20012 <br /> ........................................................................ <br /> Hate of Training <br /> Bill Robbins <br /> .........................--................................ <br /> Issued By <br /> 1004 Ameron Road, P.O. Box 878, Burkburnett, TX 70354 <br /> ren.=OA <br />