My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
REMOVAL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:51:46 PM
Creation date
11/7/2018 10:09:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2004
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\2004 REMOVAL .PDF
QuestysFileName
2004 REMOVAL
QuestysRecordDate
7/26/2018 11:28:37 PM
QuestysRecordID
3948763
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Each company vehicle is equipped with the following items : <br /> - First Aid Kit <br /> - Fire Extinguisher <br /> - "Stop/Slow" traffic signs <br /> - Warning Triangle/Flare Kit <br /> 4.0 TRAINING <br /> All personnel who may be exposed to onsite contaminants must <br /> provide documentation of the following: <br /> - Current certification of 40 hours of (OSHA) classroom <br /> instruction/hands-on training to include : <br /> - Three days of field experience under the supervision an <br /> experienced supervisor. <br /> - Eight hours of annual classroom refresher training. <br /> - Eight hours of supervisory training if a team member is <br /> a designated supervisor. <br /> - Hazard communications training. <br /> 5. 0 PROJECT-SPECIFIC TRAINING <br /> Project-specific training and information will be provided either <br /> before traveling to the site or at the site before entry into the <br /> exclusion zone. The information and training will be documented <br /> and will include the following: <br /> - The contents of this Health and Safety Plan <br /> - A discussion of the health and safety hazards; <br /> protective measures and work practices for handling <br /> contaminated soil, water or equipment . <br /> 6.0 LEVELS OF PROTECTION FOR EACH WORK zoNE <br /> Protective equipment has been selected for use in each work zone <br /> based on anticipated hazards . Specific protective equipment <br /> requirements are as follows: <br /> Exclusion zone - Level D protection will be required <br /> within the exclusion zone <br /> for any workers engaged in <br /> sample collection or other activities on site. Level D <br /> protection will include a hard hat, steel-toed boots, <br /> safety glasses, hearing protection, and Nitrile gloves . <br /> Coveralls are optional but recommended. <br /> Level C protection will be required if PID readings <br /> exceeding 100 ppm total volatile organics over <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.