My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:51 PM
Creation date
11/7/2018 10:11:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1991
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1991 INSTALL .PDF
QuestysFileName
1991 INSTALL
QuestysRecordDate
7/27/2018 4:48:55 PM
QuestysRecordID
3949488
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I :JNDERGRCUND TANK INSPECTION RECORD <br /> NEW TANK INSTALLATION / ,O <br /> INSPECTOR'S NAME I.tJLI � cc, ' "` CI <br /> AM <br /> CITY J-I� � n4ianon� _�(ryIIP 9z iC O,-.� <br /> H F1 VI/1 /' O PHONE O (oV a J � 7 7 <br /> NAME r �1' � 1..� <br /> (' t / PHONE �1 <br /> ,wNER: NAME l� <br /> DIS INSPECTOR'S <br /> DATE / PP,ROV/ED PPROVED INITIALS ITEM OR EQUIPMENT INSPECTED <br /> 9)f1��t 1. Fees paid <br /> • Plans Approved <br /> INITIAL INSPECTION 77�� Q1ES�1 <br /> UL numbers a 37195 tank size Ll <br /> Tank tested upon deliv y [Holiday (plastee() or air at 5 PSI P)7 <br /> Visual inspection of secondary containment. <br /> Tank appropriately placed with approved backfill. <br /> IPING STAGE INSPECTION JO rt'Sr <br /> %� 7... I � 1. Pressure test of piping. (Primary andecondary NFPA 30)l <br /> z <br /> 2. Ball float valves installed. <br /> 3. Overfill protection installed, describe: <br /> 4. Unused tank openin sealed nd cathcdically protected. <br /> v 1 5. Visual inspection of secondary containment on piping. <br /> (_ _�Y ✓ 6. Monitoring ports in place and brought to grade. (lockable weather proof covers) <br /> 7. Fitt and vent piping brought to grade. <br /> D. Product line leak detector in place. (Hard wired) <br /> 9. Approved tank leak monitoring device installed. <br /> 10. All galvanized piping and fittings properly wrapped. <br /> 11. Pressure decay test on complete tank and product delivery system. / <br /> i <br /> INAL INSPECTION <br /> 1. Precision test successfully completed and hard copies rec=(NFPA <br /> 2. Spill protection at fill pipe. <br /> 1 _4a 3. Performance test of overfill protection system. <br /> 1 4, Performance test of product line leak detector. (Hard wired) <br /> 5. Performance test of continuous monitoring system(s) on tank (s) <br /> 6. Permit to operate application complete. <br /> �e �] 7. Acceptable recordkeeping system. <br /> . <br /> Comments: :F r�Ti( wake <br /> EN Z3 006 10/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.