My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:51 PM
Creation date
11/7/2018 10:11:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1991
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1991 INSTALL .PDF
QuestysFileName
1991 INSTALL
QuestysRecordDate
7/27/2018 4:48:55 PM
QuestysRecordID
3949488
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLII HEALTH SERVICES <br /> STN JOAQUIN COUNTY ' <br /> JOGI KHANNA M.D.,M.P.H. <br /> Health Officer • �•., P <br /> P.O. Hos 2009 • (1601 East Hazelton Avenue) •Stockton, California 95201 'PtiFba`' <br /> (209)468.3400 <br /> TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAGE TA`M <br /> San Joaquin County Public Health Services-Environmental Health Division (PHS-EHD) has established the <br /> following guidelines to assist you in the completion of your construction project. The guidelines specify the <br /> construction and monitoring criteria necessary to complete our review of your proposed underground storage <br /> tank (UST) system. <br /> 1. SUBMt MAL OF PLANS <br /> a. Submit 3 complete sets of detailed drawings in non-erasable print to the Environmental <br /> Health Division. Upon approval, one set will be retained by the department and the other <br /> three will be returned. <br /> b. Include equipment and material specification sheets and manufacturer's brochures describing <br /> operating and monitoring systems and listing numbers or other evidence of a nationally <br /> recognized testing organization approval. <br /> C. Include detailed monitoring and response plans for facility. <br /> d. The drawn to scale plot plan should illustrate the location of all existing and proposed <br /> structures, including existing UST(s). <br /> e. The plans should include a cross sectional diagram of the tank and piping system including <br /> secondary containment, overflow protection equipment, and extension of all pipes and/or <br /> ports from subgrade to finish grade. <br /> 2. PLAN REVIEW AND OPERATING PERMIT FEES <br /> a. New facility plan review fee of 5424.00 (8 hour minimum per facility), 5170.00 fee per tank, <br /> plus 556.00 state surcharge fee per tank is due at time of plan submittal. <br /> b. New installation of additional tank at an existing facility is 5424.00 plan review fee (8 hour <br /> minimum per facility)plus 5170.00 fee per new tank,and 556.00 per tank state surcharge fee. <br /> c It should be noted that a 5424.00 plan review check fee required for each submittal allows <br /> for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br /> plan review, meetings, inspections, phone or office consultations will be billed to the <br /> applicant at a rate of 553.00 per hour. <br /> d. The maximum review time for UST installation plans is 40 working days. A preliminary <br /> review will be conducted by the PHS/EHD within 20 working days of submittal date to <br /> identify any gross plan deficiencies. <br /> e. If gross deficiencies are identified, the plans will be returned with checklist identifying plan <br /> deficiencies. <br /> f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br /> submitted to have review completed within 10 working days of submittal date <br /> 1 <br /> A Division of San Joaquin Counry HeaIN Care scrvic 3 �> <br />
The URL can be used to link to this page
Your browser does not support the video tag.