Laserfiche WebLink
13. TANK(s) TO BE INSTALLED <br /> Steel-clad with fiberglass reinforced plastic. c&,� Wcz.eQQrJ. <br /> (nB. Holiday test required immediately before "setting' tank(s) (35,000 - <br /> 40,000 volts). [Section 2635 (b) (4)] <br /> C. Fiberglass ctions 2635 (3) and 263 (p)] <br /> (1) Stri plate di ions and materials. <br /> (2) Striker p under all accessible openings. <br /> (3) 1 allation instruc ' ns require air testing and soaping <br /> prior to installation. <br /> D. on-clad steel tank [Sectio _635 (b)] <br /> Cathodi rotection provided for entire tank, piping and <br /> comp ents (nuts, bolts, washers, etc.). <br /> (2) ppro by a corrosion engineer or MA.C.E. <br /> technician. <br /> Document statin; ction method and frequency <br /> (minimum semi-annual ins on requirement). <br /> E. er types of tanks. <br /> (1) Chemical compos' ' of material stored is provided. <br /> (2) c stract service number(CAS#) <br /> 14. Overfl, protection systems (detail drawing of sp' catchment basins)/piping <br /> sump(s)) required). (Section 2635 (b) (8)) <br /> 1 Q A. Spill catchment basin. ®PLJ ! <br /> L/ Capacity: <br /> _Z Type: -- <br /> 5 <br />