My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:51 PM
Creation date
11/7/2018 10:11:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1991
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1991 INSTALL .PDF
QuestysFileName
1991 INSTALL
QuestysRecordDate
7/27/2018 4:48:55 PM
QuestysRecordID
3949488
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. Secondary con 'ner(s) thickness, density, c position, product compatibility. <br /> Sized to con 'n unauthoriz releases from primary containers to allow <br /> sufficient time detecd and removal. [Section 2631 (c)] <br /> 21. Secondary contain volumetric requirements: [Section 2631 (e) (1) <br /> and (2)] <br /> A. ingle primary Mainers = 100%. - <br /> Multiple primary co ainers = 150%o of largest primary <br /> container or 10% above aggregate. <br /> 22. Secondary container open rainfall. [ Section 2631 (f)] <br /> Volumetric re ' e nts = 24 hours of 100 year storm in addition to <br /> primary co ner vol S. <br /> 23• Secondary container oar. [Section 2631 (i)] <br /> A. Constructe on firm base. <br /> B. Sloped to coIle ion sump ( 1/8 in per foot). <br /> (1) One or are acces casings installed in sump. <br /> (a) Siz t allow removal of collected liquid. <br /> (b) E en d to ground surface. <br /> (c) Covered h a locked waterproof cap or <br /> within a secu ed facility. <br /> d) Thickness allows or anticipated stresses. <br /> (e) Construction materi s are not weakened <br /> stored product or will of donate, capture, <br /> or mask constituents to be monitored. <br /> 24• Membrane liner specifications. [Section 2631; k,l, and m] <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.