My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:51 PM
Creation date
11/7/2018 10:11:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1991
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1991 INSTALL .PDF
QuestysFileName
1991 INSTALL
QuestysRecordDate
7/27/2018 4:48:55 PM
QuestysRecordID
3949488
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANDERGROUND TANK INSPECTION RECORD <br /> {'� NEW TANK INSTALLATION / - ,,/ <br /> SITE NAME I",1 , �, ^^ INSPECTOR'S NAME /�a4i�a, ,� <br /> ADDRESS ( D (fD AI_/2 �"�" ��t �y1fL� CITY -S+IO C .[� / (, ZIP 9. <br /> CONTRACTOR: NAME I � k. r Y l L O PHONE �qq l — 2277 <br /> _ <br /> OWNER: NAME PHONE p� a <br /> f <br /> DIS INSPECTOR'S <br /> DATE PPROVED PPROVED INITIALS <br /> 9I <br /> lII 1( -"" -rMl� 1. Fees paid ITEM OR EQUIPMENT INSPECTED <br /> Q� 1�'T <br /> I(� aI (1 l 0�- Plans Approved <br /> INITIAL INSPECTION 9� D1�•S�-� <br /> UL numbers Q 3 7 / %T tank size V <br /> . Tank tested upon deliv y [Holiday (plasteel) or air at 5 PSI P)) <br /> v <br /> . Visual inspection of secondary containment. <br /> Tank appropriately placed with approved backfill. <br /> 1 <br /> (PING STAGE INSPECTION .Sb teS7- <br /> 1. Pressure test of piping. (Primary and SiiED>NFPA 30)) <br /> Z. Ball float valves installed. <br /> - / <br /> �l�v 3. Overfill protection installed, describe: <br /> - <br /> a 14-204. Unused tank opening eaI ed)§nd cathodically protected. <br /> - L t �. 5. Visual inspection of secondary containment on piping. <br /> (p"q 6. Monitoring rt In p e and brought o gra e. (lockab weather pr f covers) <br /> 4'9 ✓ 7. Fill and vent piping brought to grade. <br /> 8. Product line leak detector in place. (Hard wired) <br /> 9. Approved tank leak monitoring device installed. <br /> 10. All galvanized piping and fittings properly wrapped. <br /> 11. Pressure decay test on complete tank and product delivery system. <br /> rt <br /> INAL INSPECTION <br /> 1. Precision test successfully completed and hard copies received. (NFPA 329) <br /> 2. Spill protection at fill pipe. <br /> ♦, 1p'h� '�, 3. Performance test of overfill protection system. <br /> 4. Performance test of product line leak detector. (Hard wired) <br /> 5. Performance test of continuous monitoring system(s) on tank (s) <br /> 6. Permit to operate application complete. <br /> �� `( ✓ 7. Acceptable <br /> /reco�rdkeeping system. <br /> . <br /> Comments: <br /> EH 2 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.