Laserfiche WebLink
Mc6 U��E�C�o�l woIG LL --- <br /> TH86,AnFIn C,0MNecTl0q <br /> WITH W <br /> LEAKPMCTION SYhjI:M <br /> 2 'I USN T <br /> a (�P j2' ©G. �o vI ,CCTloNS 4), mw blip rl <br /> - . -- —_ <br /> 21 l'm b11G� .. L . <br /> 3eaV' - CoMf741T 2 � 0 <br /> LI _ C4NpUl !/ <br /> N L <br /> OdecL, %LL�b�' <br /> ��`G� bfs�Ei�15��, ISLArJr� , <br /> Li <br /> LITiF <br /> boul� . <br /> CTD,LVAfJI� �bg►J�KLI;S> <br /> TomS I lo, 000 �QL_Lof� o,000 �ALLo%( <br /> m��TIU ce?jj b T u�1L�hb� e FUEL TA�I� bI�S�L �u�L TA IL ' <br /> � � I I <br /> I LJ o --= -- -- - -{ _ -_ I - 4 ulELbeb AYE a bll'P�O Coal VhNl ��b ( i'I�L) ., , <br /> r f 3 _- - T 4- - 211 �AL�Af llz�b �rRAp (T ft'I��L� - - - -- 4 . . - - - --- - - �,, <br /> -- 1 / I b , • Trlch�!�JIt'pEb ��L � I��b �tX' _ II <br /> 21' - <br /> P, <br /> 1' <br /> , I <br /> r <br /> , <br /> w <br /> 1 <br /> C[ROS2 ; ZE(cumm _ SG M L 3j8 p l <br /> " HE" AL NOTES <br /> INSTALLATION — <br /> 1, TANK 5 UNLESS CERTIFIED BY A REGISTERED, CIVIL OR EXCAVATION SHALL COMPLY IN ALL RESPECTS TO TESTING <br /> ' . STRUCTURAL ENGINEER, TANKS, SHOULD .NO1` BE TITLE 8 O THE CALIFORNIA ADMINISTRATIVE <br /> PLACED WITHIN .10 FEET OF-. ANY FOUNDATION . �` CODE SECTION 1640(D) , REQUIRING EITHER SHORING OBTAIN ACCEPTANCE OF TESTS FROM LOCAL INSPECTION AUTHORITY 2, PIPING FOR SINGLE WALLED PIPING, DISCONNECT THE <br /> PROVIDE. SUFFICIENT DEAD WEIGHT (FOR ,EXAMPLE: OR 450 TAPER TO EXCAVATION WALLS IN ALL AREAS <br /> A REINFORCED CONCRETE DEADMAN`S SLAB?"JO, WHERE EXCAVATION EXCEEDS 4 FEET BEFORE BACKFILLING TANK AND/OR PIPING , ENTIRE PIPING SYSTEM FROM PUMPS AND/OR <br /> BACLASt THE EMPTY TANK AGAINST MAXIMUM ^' DISPENSERS AND TANKS , APPLY 50 PSIG AIR <br /> ' 1, TANK FOLLOW MANUFACTURERS RECOMMENDATIONS FOR PRESSURE , THE INITIAL TEST PRESSURE, SHOULD <br /> ANTiCIPATEP UPLIFT FORCES PROVIDE GAL- N <br /> TESTING , 1N GENERAL, TEST THE TANK WITH BE MAINTAINED FOR 60 MINUTES WITH ONLY <br /> ' CULATIONS TO DEMONSTRATE THE ADEQUACY OF. . •,_.,_,... - - BETWEEN 3 AND 5 PSIG AIR PRESSURE BEFORE MINIMAL PRESSURE .DROP . LEAKS MAY BE LOCATED <br /> THE BALLAST PROPOSED. TANK EXCAVATION .SHOULD a.. 2, PIPING BEFORE UNDERGROUND PIPES ARE LAID, PLACE <br /> LOWERING THE TANK INTO THE EXCAVATION . THE BY SOAPING ALL JOINTS WHILE THE SYSTEM IS <br /> BE LARGEENOUGH .TO PROVIDE A MINIMUM 1� � AND COMPACT CLEAN SAND IN THE TRENCH TOA <br /> INITIAL TEST PRESSURE SHALL BE MAINTAINED ^ UNDER PRESSURE. FOLLOW MANUFACTURER'S <br /> CLEARANCE IN ALL HORIZONTAL DIRECTIONS MINIMUM 6", AFTER LAYING THE PIPES, PLACE WITHOUT SIGNIFICANT PRESSURE DROP FOR 10 INSTRUCTIONS FOR TESTING DOUBLE-WALLED <br /> AS PER MANUFACTURER S INSTRUCTIONS, COVER AND COMPACT CLEAN, AIR-DRY SAND AROUND AND MINUTES BEFORE INSPECTING TANK SEAMS AND PIPING <br /> :DEPTHS SHOULD MEET MANUFACTURERS, SPECIF^ . " OVER THE PIPES TO A MINIMUM COVER OF PIPE OPENING CONNECTIONS , ALL SEAMS AND ~ <br /> ICATtONS, PROVIDE A 12`' BED OF 3/8" DIA, . FILL THE REMAINDER OF THE TRENCH WITH - - <br /> CONNECTIONS SHALL BE LEAK TESTED AT FULL -, <br /> PEA GRAVEL TO ASSURE UNIFORM SUPPORT UNDER EITHER SAND OR BACKFILL IN 6" MAXIMUM - <br /> r , . TEST PRESSURE WITH A SOAP AND WATER SOLUTION, <br /> FLOWING CLEAN PEA LGRAVEMNATURALLY-ROUNDED. DENSITYOFASTM A1557-73, OOR OF <br /> THE DENSITY IF TANKS ARE DROPPED OR IMPACTED AFTER : ��/etaa(nlrta Gowlbv�a.�,P,u. <br /> .THE TANK BACK A <br /> AGGREGATE WITH Pl1RTICLE1!{ANGING_ FROM I/8" SPECIFIED FOR THE SURROUNDING FILL, WHICH INITIAL PRESSURE TEST, REMOVE TANK FROM <br /> To 3/8" IN DIAMETER) COVERING TANK TO WITH- EVER IS HIGHER . ' BACKFILL MAY BE EXCAVATED EXCAVATION AND REPEAT THE TEST PROCEDURE , <br /> IN 12" OF GRADE AND FINISH WITH 1/4" CRUSHED MATERIAL, PROVI�ED IT DOES NOT CONTAIN 1F TANK LEAKS, IT SHALL BE REPLACED, NOT STOCKTON SERVICE CENTER <br /> STONE, ORGANIC MATTER, AND SHOULD BE PLACED A7 REPAIRED. <br /> ' L , , baa CLOSE TO OPTIMUM MOISTURE CONTENT, - MICROFILM <br /> .« a* ,r� " � . <br /> PROJECT NO. TL 390-0042-01 <br /> APPROVED GM BILL OFMATL <br /> SUPV DWG LIST <br /> SUPSOS <br /> No DAT I O.K. PACIFIC GAS AND ELECTRIC COMPANY SHEET N sNREvs <br /> a .. SN 0. <br /> R REVISIONS OwN <NNO. SUDS APUD. BY N0. DATE DESCRIPTION GM/SPED OWN CNKO. SUPV, APVO BY SCALES gqN. FRANCISCO, CALIFORNIA R - 3 <br /> REV.IS10N�S <br /> ' ' <br /> 34ne1 rni 10 01 NO, «iAnvnwr. , E DESCgIPT10N GM/SPEC <br />