Laserfiche WebLink
***AMENDED REPORT*** <br /> REPORT DATE : November 6, 1991 PROJECT MGR: J. Valett <br /> EXAMINATION NO. : 691-5687.11 PAGE 18 of 23 <br /> CLIENT : Pacific Gas & Electric Company <br /> PROJECT NAME : PG & G Stockton Service Center <br /> DATE SAMPLED : 10-16-91 at 1425 hrs. by R. Kurz <br /> DATE RECEIVED: 10-16-91 at 1735 hrs. from R. Kurz <br /> DATE PREPARED: 10-17-91 <br /> DATE ANALYZED: 10-17-91 <br /> ANALYZED BY : S. Singh <br /> REVIEWED BY : J. Koelewyn <br /> SAMPLE TYPE : Soil <br /> SAMPLE IDENTIFICATION: S-11-SP-1-South West 211 <br /> CONSTITUENT RESULT METHODS MDI, <br /> (mg/kg) <br /> (mg/kg) <br /> Benzene 0. 016 8020 0.005 <br /> Toluene 0 . 062 8020 0 .005 <br /> Ethylbenzene 0. 011 8020 0 . 005 <br /> Xylenes 0 .88 8020 0 . 005 <br /> TPH-Gasoline 25 GC/FID 0.2 <br /> NOTES.- <br /> Preparation <br /> OTES:Preparation (BTEX & TPH-Gasoline) : 5030 <br /> TPH : Total Petroleum Hydrocarbons <br /> mg/kgs milligrams per kilogram (parts per million) <br /> MDL : Method Detection Limit <br /> ND : None Detected <br /> Fresno Modesto Visalia Bakersfield <br />