Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE 1One form er faeili ) _ <br /> TYPE OF ACTION ❑ 1.NE1V PLAN ® 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> Pacific Gas and Electric Com an -Stockton Service Center SAN r-mviR„rgk1 count r <br /> BUSINESS SITE ADDRESS 103• BUSINESS SITE CITY HEALTH n-:� 9 iTkMi <br /> 4040 West Ln Stockton 95204 <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed front secondary containment systems, or from clean-up activity,has been in contact with any <br /> hazardous material. If the nater is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 funds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to stone water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. TI»s <br /> equipment is inspected at least monthly,and after each nue,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PEICNIANEN TLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete ly 7 applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> Absorbents R10- Fleet Garage&Warehouse R20. Onsite Rae. <br /> Street broom " Warehouse R2'. Onsite R31. <br /> Flat-bottom shovels Rte Warehouse R2z. Onsite R32. <br /> (4)55-Gallon drums R13- Hazardous Waste Storage R23. Onsite R33. <br /> Area <br /> Rid. R24. Rad. <br /> Rls. R25. R35. <br /> IV. .RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40• TITLE Rso. <br /> Mike Hayworth Fleet Services Supervisor <br /> NAIVE R41. TITLE R51. <br /> Eddy Irons Field Specialist <br /> NAIIE __ R42. ,TITLE R52. <br /> R.Alex Steele Environmental Field Specialist <br /> NAME R43. TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> [31. ADDITIONAL.SYSTEM TESTING OR DATA COLLECTION ®2. INSPECTION BY QUALIFIED PERSONS ❑3. RECALIBRATION OF EQUrnIENT R60. <br /> ❑99. OTHER(Specify): 1' <br /> UN-022B-1/3 irlrlw.unidocs.org Rev.04/02/08 <br />