Laserfiche WebLink
Specification No . : RGS0024--87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 2 - Summary of The <br /> Work <br /> 2 . 6 . 2 Contract Change Orders : Additional work on changes shall <br /> be performed by Contractor only when authorized in <br /> writing and signed by P .G . & E . <br /> 2 . 7 Information : For information pertaining to these <br /> specifications bidder will contact : <br /> Barry D. Moore <br /> Twining Laboratories , Inc . <br /> 2527 Fresno Street <br /> Fresno , California 93721 <br /> ( 209 ) 268-7021 <br /> Mike Bennett or Fred Fulkerson <br /> Pacific Gas and Electric Company <br /> 1401 Fulton Street <br /> Fresno , CA 93760 <br /> (209 ) 443-5560 <br /> 2 . 8 Prebid Conference : A prebid conference will be held at a <br /> time and place designated by the project engineers . Bids <br /> will be received only from the project engineers . Bids will <br /> be received only from those contractors attending the prebid <br /> conference . <br /> 2 . 9 Confidentiality : <br /> 2 . 9 . 1 In the course of performing the services under this <br /> Contract , Contractor may have access to confidential , <br /> commercial , or personal information concerning , but not <br /> limited to , technological , ratemaking , legislative , and <br /> personnel matters and practices of F . G . & E . , its <br /> subsidiaries , affiliates , or members of the public . <br /> Contractor agrees not to disclose any such information <br /> without the prior written approval of P .G . & E . <br /> 2 . 10 Title : <br /> 2 . 10 . 1 Contractor hereby agrees that title , risk of loss , <br /> responsibility , and all liability for all hazardous <br /> material or waste generated by the Contractor under this <br /> Contract shall irrevocably pass to Contractor when said <br /> material or waste is removed from each of the P .G . & E . <br /> sites . <br /> • II-3 <br />